Laserfiche WebLink
1.2 Report Organization <br />This section presents project background and report organization. <br />Section 2 summarizes the following: <br />• Information uncovered during excavation of the Haul Road HR -1 slide <br />• Basis of design recommendations <br />• Summary of construction activities and testing results <br />• Record information for the final repair and slope stability analysis <br />Section 3 presents proposed installation of mirrors, inclinometers, and piezometers for the haul road, <br />buttress and RPEE refuse areas to monitor for potential slope movement. <br />Section 4 presents modifications to the RPEE drainage plan, including changing the routing of runoff <br />and sediment drainage, as well as revised design of the sediment ditch and clearwater ditch. <br />P Mpls 06 CO 26 06261003 Haul Road Slide Repair WorkFiles Report MCC Slump Repair- Instrumentation- DrainRev _2012 -05 -25 docx <br />7 <br />