Laserfiche WebLink
A. Survey Mirrors: It is proposed to measure mirrors monthly throughout the year. <br />B. Inclinometers: It is proposed to measure inclinometers monthly throughout the year, but bi- <br />weekly readings may be warranted during the spring months when slope movement typically exhibits <br />the highest likelihood. <br />C. Piezometers: It is proposed to measure water levels monthly throughout the year, but bi- weekly <br />readings may be warranted during the spring months when slope movement typically exhibits the <br />highest likelihood. Piezometer measurements may be taken at the same time the associated <br />inclinometers are being read. Thus, it is recommended to read the piezometers on the same schedule <br />as the inclinometers. <br />P Mpls 06 CO 26 06261003 Haul Road Slide Repair WorkFiles Report MCC_ Slump Repair- Instrumentation- DrainRev_2012- 05 -25 docx <br />16 <br />