Laserfiche WebLink
2.4.4 Recommendations <br />Repaired haul road slopes should be monitored as described in the next section of this report. If <br />slope movement is noted, several measures are available to increase the factor of safety. Such <br />measures include: <br />• Constructing a trench drain along the haul road to improve dewatering of the slope <br />• Buttressing the toe of the slope, in conjunction with extending the drainage blanket on the <br />lower bedrock bench <br />• Placing additional fill against the slope below the haul road, again in conjunction with <br />extending the drainage blanket on the lower bedrock bench <br />• Other drainage improvements <br />P Mpls 06 (0 26 06261003 Haul Road Slide Repair WorkFiles Report MC('_ Slump Repair - Instrumentation- DrainRev 2012 -05 -25 docx <br />11 <br />