Laserfiche WebLink
GCC <br />within a designated time consistent with the timeline proposed by Trautner Geotech <br />(Abatement Step #1). <br />In the event that the site evaluation, or the Division's review of a submitted Technical <br />Revision, fmds that it is not possible to meet the applicable CDRMS performance <br />standards, GCC Energy commits to moving the existing material to the existing <br />approved refuse pile (Abatement Step #2). <br />GCCE firmly believes that the final goal of this process is to reclaim the King I site in a <br />way that is aesthetically pleasing, environmentally sound, and safe for future <br />generations. We believe that the area in question achieves approximate original <br />contour and it would be in everyone's best interest for the final configuration to appear <br />much like it exists today. <br />Please call Tom Bird at (970) 385 -4528 x 6503 if you have any questions or comments. <br />Sincerely, <br />Tom Bird <br />Manager, Coal Services <br />GCC Energy, LLC <br />"Safety as a Value" <br />Telephone. 970 385 4528 <br />Facsimile. 970 385 4638 <br />GCC Energy, LLC <br />6473 County Road 120 <br />Hesperus, CO 81326 <br />