Laserfiche WebLink
Month <br />(Col 1) <br />Gravel Pit Evaporation <br />Mining Operation <br />Dust Suppression <br />Total Depletion <br />Ac -ft <br />(Col 9) <br />Depletion <br />% <br />(Col 10) <br />Stream Depletion <br />Ac -ft <br />(Col 11) <br />Replacement Water <br />Ac -ft <br />(Col 12) <br />Feet <br />(Col 2) <br />Ac -ft <br />(Col 3) <br />Product Tons <br />(Col 4) <br />Water (Ac -ft) <br />(Col 5) <br />Meter <br />(Col 6) <br />Gallons <br />(Col 7) <br />Ac -ft <br />(Col 8) <br />January <br />0.12 <br />1.27 <br />0 <br />0.00 <br />0.00 <br />1.27 <br />136.54 <br />February <br />0.15 <br />1.59 <br />0 <br />0.00 <br />0.00 <br />1.59 <br />113.67 <br />March <br />0.22 <br />2.33 <br />0 <br />0.00 <br />0.00 <br />2.33 <br />96.23 <br />April <br />0.36 <br />3.82 <br />0 <br />0.00 <br />0.00 <br />3.82 <br />84.52 <br />May <br />0.45 <br />4.77 <br />0 <br />0.00 <br />0.00 <br />4.77 <br />86.47 <br />June <br />0.59 <br />6.26 <br />0 <br />0.00 <br />0.00 <br />8.26 <br />84.10 <br />July <br />0.59 <br />6.26 <br />0 <br />0.00 <br />0.00 <br />6.28 <br />90.93 <br />August <br />0.55 <br />5.84 <br />0 <br />0.00 <br />0.00 <br />5.84 <br />95.60 <br />September <br />0.41 <br />4.35 <br />0 <br />0.00 <br />0.00 <br />4.35 <br />108.54 <br />October <br />0.29 <br />3.08 <br />0 <br />0.00 <br />0.00 <br />3.08 <br />1 119.91 <br />November <br />0.18 <br />1.70 <br />0 <br />0.00 <br />0.00 <br />1.70 <br />151.19 <br />December <br />0.13 <br />1.38 <br />0 <br />0.00 <br />0.00 <br />1.38 <br />144.20 <br />Total <br />4.02 <br />42.85 <br />0 <br />0.00 <br />0.00 <br />42.65 <br />- <br />Water surface area of the gravel pit totals: <br />Replacement Source: <br />Note: Monthly send copies 1o: <br />12/28/2011, Helton WNNamsen, P.C. <br />AGUA lease <br />10.61 acres <br />Coll: Present month. <br />Co12: Net evaporation rate. <br />Cop: Co12 X water surface area of pit, In acres. <br />Colo: Weight of mined material hauled from she, In tons. <br />Co15: Four percent by weight of the product hauled from she. <br />Co16: The present month's meter reading. <br />Co17: The present month's meter reading - the previous month's meter reading. <br />Co18: Col 7 converted to acre -feet. <br />core: Col 3 + Co15 + Co18. <br />CollO: Monthly depletion rate percent. <br />Coll l : Col 9 X Col 10. <br />Co112: Replacement water from AGUA. <br />BIN Tyner All Rite Paving 8 Redl -Mix <br />CDWR c/o A.6 S Construction Co. <br />310 E. Abrlendo PO Box 588 <br />Suite B Canon City, CO 81215 <br />Pueblo, CO 81004 <br />TABLE 1 <br />Water Accounting Form <br />ALL RITE PAVING AND REDI -MIX, INC. <br />North River Pit <br />La Junta, Colorado <br />Year: 2012 <br />