Laserfiche WebLink
Chapter V <br /> The 2.6 acre fill adjacent to the Tunnel Pad will remain as part of <br /> the approved post mining plan. <br /> d. Preparation Plant Area. <br /> The backfill and grading plan for the central complex/preparations <br /> plant area is found in App. V-E-3. <br /> At the conclusion of mining, the wash plant and other surface <br /> buildings in the area will then be disassembled. Metal will be <br /> sold as scrap, and the foundations rubblized. The rubble will be <br /> used as part of the backfilling and grading to achieve post-mining <br /> contours. <br /> The plan to achieve the post-mining contours in this area is that <br /> the rubble will be placed against the toe of the hillside behind <br /> the preparation plant, and the area will be graded. <br /> 25 Revised 6/91 <br />