Laserfiche WebLink
APPENDIX V-E-3 <br /> BACKFILL/GRADING PLAN FOR PREPARATION PLANT AREA <br /> 1. Cross-section A-A Wash Plant - Thermal Dryer <br /> 40,000 +/- Rubble from wash plant <br /> 6,000 +/- Soil material <br /> Total: 46,000 cu.yds. <br /> 2. Cross-section A-B Bathhouse and Engineering Area <br /> 10,500+/- Rubble from bathhouse/engineering <br /> 6,000+/- Soil material <br /> Total: 12,000 cu.yds. <br /> 3. Cross-section C-C Savage Shop/Yard Area <br /> 10,800+/- Cut & fill, plus some rubble from <br /> Savage Shop. <br /> 1,200+/- Soil material <br /> Total: 12,000 cu.yds. <br /> TOTAL: 104.000 cu. yds. <br /> The plan is for placement of rubblized material from the buildings <br /> in the preparation plant area against the toe of the hillside back <br /> of the preparation plant area. Available soil material will be <br /> used to cover the rubble. <br /> The preparation plant area was constructed prior to passage of the <br /> Act, and no soil materials were salvaged. The estimates of soil <br /> material are what is anticipated to be available for backfilling of <br /> this area.' <br /> ' Mid-Continent believes acceptable post-mining contours <br /> can be achieved without the use of coal refuse materials <br /> for fill, and this plan of 6191 contemplates no such use. <br />