Laserfiche WebLink
No. 4 Mine Bench 8, 625 <br /> No. 5 Mine Bench 19, 540 <br /> Storage Pads 3 & 4 6, 596 <br /> Haul Roads 205,043 <br /> Light Use Roads 5,000 <br /> Rock Tunnel to Prep Plant 167, 926 <br /> New Coal Refuse Area 8,024 <br /> Sediment Ponds 63, 600 <br /> Preparation Plant Area 72, 541 <br /> Finish Grade All Disturbed Areas 19, 817 <br /> Sub Total $626,035 <br /> Topsoil Replacement <br /> Mine Portals <br /> Nos. 1, 2 & 4 Mine Benches $ 33, 675 <br /> No. 3 Mine Bench 10,268 <br /> No. 5 Mine Bench 5, 666 <br /> Haul Roads 44, 983 <br /> Rock Tunnel to Prep Plant Complex 155, 221 <br /> Sub Total $249, 813 <br /> Revegetation <br /> All Disturbed Areas (350 <br /> Acres x $1,395) Sub Total $488,250 <br /> Coal Loadout Facility <br /> Converting to other Industrial <br /> Uses Sub Total $108, 722 <br /> Mobilization and Demobilization of Equipment <br /> Sub Total $ 28, 143 <br /> 1 <br /> 4 <br />