My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (199)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (199)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:58:51 AM
Creation date
5/24/2012 3:01:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Estimated Reclamation Cost Calculations Table of Contents
Section_Exhibit Name
Chapter V Appenidx V-D-1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.,� EARTHWORK ESTIMATING - TRUCK/LOADER TEAMS <br /> TASK DESCRIPTION: �� 3 <br /> HOURLY EQUIPMENT COST: <br /> Truck make and model 7; ? c <br /> Loader make and model 7&a e <br /> adjusted Operator Cost Per Hour <br /> hours days base base shift total <br /> shift per per rental operating wage overtime premium equip. <br /> no. day week rate/hr. cost/hr rate/hr adjustment adj. cost/hr <br /> 6 y9 -V7 90 / v. <br /> .J l 7 80 <br /> i 2 <br /> 3 <br /> total truck cost/hr. = 1, 9 7 0 <br /> total loader cost/hr. - tiyv <br /> $ o r /hr. divided by _�_ shifts/day = $ average truck cost/hr. <br /> divided by shifts/day = $ i yo.&4 average loader cost/hr. <br /> MATERIAL QUANTITIES: <br /> Bank volume = BCY x swell factor = 806 -;z LCY <br /> Verification method(s) used /h-✓ —G-��°L• <br /> HOURLY PRODUCTION: <br /> Haul distance =S-a 8 c, ft. , return distance = ft. , altitude = ' ft. <br /> Total resistance au � % rolling res. plus h grade res. +or- _ p % <br /> Total resistance (return): rolling res, plus grade res. (+or-)= _7 $ <br /> Note: for grade resistance, (+) = unfavorable, favorable (downhill ) <br /> Truck capacity LCY (nominal heaped) <br /> Loader capacity = LCY (nominal heaped) x /o o bucket fill factor from <br /> fill factor adjustment table in Section VII = LCY/bucket load (adj. cap'y) <br /> No. of loader passes required to fill truck = = (round to nearest whole no.) <br /> Adjust truck capacity = 3o ? LCY <br /> Loader cycle time: basic cycle (load, maneuver and dump) = min. <br /> 1st pass = 0.1 min (bulk of 1st pass completed cfuring truck exchange time) <br /> 2nd ---------- 6 min <br /> 3rd ---------- .6 min Loader cycle corrections: <br /> 4th ---------- •6 min <br /> 5th ---------- min <br /> 6th ---------- min <br /> min total load time <br /> Truck cycle time: Exchange time ---------- 7 min. <br /> Load ------------------- i 9 <br /> Haul ------------------- s s—, <br /> Maneuver at dump ------- 7 <br /> Dump ------------------- 21 <br /> j Return ----------------- / <br /> 38 m+n <br />
The URL can be used to link to this page
Your browser does not support the video tag.