My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (199)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (199)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:58:51 AM
Creation date
5/24/2012 3:01:47 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Estimated Reclamation Cost Calculations Table of Contents
Section_Exhibit Name
Chapter V Appenidx V-D-1
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EARTHWORK ESTIMATING - TRUCK/LOADER TEAMS <br /> t , <br /> TASK•DESCRIPTION: <br /> 4 HOURLY EQUIPMENT COST: <br /> Truck make and model , S C <br /> Loader make and model _�9Q <br /> adjusted Operator Cost Per Hour <br /> hours days base base shift total <br /> shift per per rental operating wage overtime premium equip. <br /> no. day week rate/hr. cost/hr rate/hr adjustment adj. cost/hr <br /> 7. 7k 2.8a 917 <br /> 7C 7. 90 C. o <br /> E — <br /> i 2 <br /> 3 <br /> ~ total truck cost/hr. = s 97. <br /> total loader cost/hr. = S ,tea f <br /> /hr. divided by �_ shifts/day = S S o average truck cost/hr. <br /> S � hr. divided by shifts/day - S 1yo dac average loader cost/hr. <br /> MATERIAL QUANTITIES: <br /> Bank volume = BCY x swell factor G C LCY <br /> Verification met od s used - <br /> HOURLY PRODUCTION: <br /> Haul distance = o ft. , return distance = ,Sam ft. , altitude = /v �,� ft. <br /> Total resistance au : 2 % rolling res. % grade res. +or- _ /� <br /> Total resistance (return) :z % rolling res. plus grade res. (+or-)= _ � <br /> Note: for grade resistance, (+) = unfavorable, t-1 = favorable (downhill ) <br /> Truck- capacity = 30 8 LCY (nominal heaped) <br /> Loader capacity = LCY (nominal heaped) x � bucket fill factor from <br /> fill factor a justment table in Section VII = _ LCY/bucket load (adj. cap y) <br /> No. of loader passes required to fill truck = y (round to nearest whole no.) <br /> Adjust truck capacity = Jo. LCY <br /> Loader- cycle time: basic cycle ( load, maneuver and dump) = min. <br /> 1st pass = 0.1 min (bulk of 1st pass completed during truck exchange time) <br /> 2nd ---------- . G min <br /> 3rd ---------- .G min Loader cycle corrections: <br /> 4th ---------- r. min <br /> 5th ---------- min <br /> 6th ---------- min <br /> S min total load time <br /> Truck cycle time: Exchange time ---------- 7 min. <br /> Load ------------------- <br /> Haul ------------------- <br /> Maneuver at dump <br /> Dump --------- -------- 1.2. <br /> I Return ----------------- . 3 <br /> 36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.