My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (188)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (188)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 2:58:53 AM
Creation date
5/24/2012 2:18:29 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Wastewater Discharge Permits
Section_Exhibit Name
Chapter IV Appendix IV-C-1
Media Type
d
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART II <br /> Pace 12 of 20 <br /> Permit No: CO-0000396 <br /> 2. Qncormp 1 i ante (cunt ' d) <br /> (2) The following instances of noncompliance shall be reported orally <br /> within 24 hours from the time the permittee becomes aware of the <br /> circumstances , and a written report mailed within five days of <br /> the time the permittee becomes aware of the circumstances : <br /> a) Any instance of noncompliance which may endanger health or <br /> the environment <br /> b) Any unanticipated bypass which exceeds any effluent limitation <br /> in the permit <br /> c) Any upset which exceeds anv effluent limitation in the permit <br /> (See Fea. Reg. Vol . 45, No. 98, 122.60 (h) for upset conditions ) <br /> d) Daily maximum violations for any toxic pollutants or hazardous <br /> substances limited in PART I -A of this permit . <br /> t3) The permittee shall report all instances of noncompliance not <br /> reported in "Notification" , paragraph 2- (z)- (2) (above) , at the <br /> time discharge :monitoring reports are submitted (EPA Form 3320-1 ) . <br /> The reports snali contain the information listed in "Notification" , <br /> paragraph 2- (B)- (1 ) (above) . <br /> (�+) Where the permittee becomes aware that it failed to submit any <br /> relevant facts in a permit application , or submitted incorrect <br /> information in a permit application or report to the Division , <br /> it shall promptly submit such facts or information. <br /> (C) Bypass <br /> (1 ) The permittee may allow any bypass to occur which does not cause <br /> effluent limitations to be exceeded , but only if it also is for <br /> essential :maintenance to assure efficient operation. No Division <br /> notification is required, and this case is not subiect to the <br /> requirements in paragraphs 2- (C) - (2) through 2- (C)- (L) , (below) . <br /> (2) If the permittee Knows in advance of the need for a bvoass , it <br /> shall submit notice, if possible at least ten days before the <br /> gate of the bypass , to the Division and the Environmental <br /> Protection Agency ,EPA) . The bypass shall be subject to <br /> Division approval , and limitations imposed by the Division and EPA. <br /> (3) For an unanticipated bypass , see the requirements listed in <br /> "Notification" , paragraph 2- (B}- (2) , (above) . <br /> (?) Bypass is prohibited , and the Division may take enforcement <br /> action against a permittee for bypass , unless : <br /> a) Bypass was unavoidable to prevent loss of life , personal <br /> injury, or severe property damage; <br /> 1/61 <br />
The URL can be used to link to this page
Your browser does not support the video tag.