Laserfiche WebLink
Mr. Doug Bowman <br /> June 11, 1981 <br /> Page Two <br /> the number of samples required in the Aspen Shrubland reference <br /> jumps to 108. Doug, taking 108 samples would take two ecologists <br /> 15 days each. This would require in excess of $8,000 professional <br /> time and expense for this reference alone. The Aspen Woodland <br /> Reference would require 66 samples. You should seriously consider <br /> using total herbaceous cover for the sample adequacy requirement. <br /> Please call if there are questions. <br /> Sincerely, <br /> David L. Johnson <br /> President <br /> DLJ :ei <br /> Enclosure <br />