My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-23_PERMIT FILE - M2012013
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2012013
>
2012-05-23_PERMIT FILE - M2012013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:58:06 PM
Creation date
5/24/2012 6:52:56 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2012013
IBM Index Class Name
PERMIT FILE
Doc Date
5/23/2012
Doc Name
Responses to the Preliminary Adequacy Review
From
Blattner Energy
To
DRMS
Email Name
MAC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
quantity. This shall not obligate Blattner Energy to remove any material nor obligate Blattner Energy to pay Property Owner, <br />until Blattner Energy actually excavates and removes material. Further, Blattner Energy must first obtain any permit, if <br />required, before it can begin to excavate material. <br />MEASUREMENT: <br />The Payment Quantity shall be measured according to the (choose one or more): <br />Choose one or more. <br />X In -place bank cubic yards for: X gravel J rock _ borrow <br />Dry tons for: _gravel _rock _ borrow <br />Other: for: gravel _ rock borrow <br />as measured by the (choose one or more): <br />Choose one or more. <br />_ Project Owner's quantity determination for: gravel _ rock _ borrow <br />X Surveyed quantity for: X gravel _ rock _ borrow <br />Load count quantity for: _ gravel _ rock _ borrow <br />_ Belt scale weight for: _ gravel _ rock _ borrow <br />X Truck Toad weight for: X gravel rock borrow <br />with a deduction for any increase in the quantity/volume caused by augmentation of the material. <br />CONVERSION FACTOR (if necessary): The conversion factor(s) for quantity calculation shall be according to the following <br />percentage(s) for converting from the quantity measure used for measurement to the quantity measure used for payment <br />(common conversions are- loose cubic yards to bank cubic, compacted volume to bank cubic yards, wet tons to bank cubic <br />yards, dry tons to bank cubic yards, wet tons to dry tons, etc.): <br />al % to convert from <br />% to convert from <br />X Gravel: $ <br />Rock: $ <br />Borrow: $ <br />Blattner Energy, Inc. — Confidential Document <br />Tons <br />PRICE: The Price for each unit of the material removed and utilized shall be as follows: <br />per Cubic Yard and /or <br />per and or <br />per <br />to Cubic Yards for payment, and /or <br />to for payment. <br />PAYMENT: Blattner Energy shall pay Property Owner within fifteen (15) days of receipt of payment by the Project Owner /end <br />user for material removed from the Property. Payment will be made once per month to the Property Owner based on <br />accumulated truck weight tickets for the month. <br />SITE ACCESS: Property Owner hereby grants to Blattner Energy, Inc. and any of its assigns the right to free ingress and egress <br />( "Ingress & Egress ") to and from said Property at the point(s) where such material is to be removed and transported to the <br />nearest available public roads, and shall also allow Blattner Energy to construct, operate and maintain access roads on said <br />Property, in a reasonable and workmanlike manner, as may be necessary to remove said material, the road location(s) shall <br />be determined by Blattner Energy, Inc.. The Property Owner hereby grants an easement to Blattner Energy and any of its <br />assigns and releases Blattner Energy and any of its assigns from any claims for damage by reason of the above - described use, <br />according to the terms hereunder, of the Property. Boundaries of the borrow pit shall be according to the Reclamation Plan, <br />if required, the attached drawing, or shall be laid out in writing and agreed to by Property Owner prior to commencement of <br />any work on the Property. <br />GENERAL TERMS: Property Owner hereby grants to Blattner Energy, Inc. the right to set up and operate such mining, <br />crushing, washing or ready -mix plant and equipment on the Property as is required to suitably mine, process and remove the <br />material, and to import any additional materials from other sources at no additional cost as may be necessary to augment or <br />blend with the material in order to create an acceptable finished product for Blattner Energy's objectives. Should it be <br />Borrow Agreement — Page 2 of 4 <br />LE- 04 -CT- 0022 -R1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.