My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-22_HYDROLOGY - M1983193
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1983193
>
2012-05-22_HYDROLOGY - M1983193
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:58 PM
Creation date
5/22/2012 3:29:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983193
IBM Index Class Name
HYDROLOGY
Doc Date
5/22/2012
Doc Name
SUBSTITUTE WATER SUPPLY PLAN
From
OSE
To
APPLEGATE GROUP
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Jared Dains <br />May 21, 2012 <br />determines that Pioneer's excess 12 acre -feet is in fact not in excess of the amounts need by <br />Pioneer, Pioneer may reduce the amount of water leased to Monks. Total water available for <br />replacement from the two sources for this plan is 20.97 acre -feet annually. <br />The leased water and Monks water will be delivered directly into the pond. The monthly <br />depletions and replacement requirements are found on the attached Table 3. Note that only <br />water rights decreed for augmentation purposes may be used in this SWSP. <br />Conditions of Approval <br />hereby approve the proposed substitute water supply plan in accordance with §37 -90- <br />137(11), C.R.S., subject to the following conditions: <br />1. This plan shall be approved with the effective date of March 31, 2012 and shall be <br />valid through March 30, 2014 unless otherwise revoked or modified. If this plan will <br />not be made absolute by a water court action by the plan's expiration date, a <br />renewal request must be submitted to this office with the statutory fee (currently <br />$257) no later than February 13, 2014. <br />Page 3 <br />2. The Applicant must provide the name, address and phone number of the person <br />who will be responsible for the operation of the plan to this office, the Division <br />Engineer, and the Water Commissioner within 20 days of the receipt of this <br />approval, and must be provided on the accounting forms submitted to the Division <br />Engineer and Water Commissioner. <br />3. Well permit no. 68041 -F, was obtained for the current use and exposed pond surface area of <br />the gravel pit pond in accordance with §37 -90- 137(2) and (11), C.R.S. <br />4. The water consumption and depletions associated with this mining operation must <br />not exceed those amounts listed on the attached Table 3. The total area of <br />exposed groundwater shall not exceed 1.07 acres, and total consumptive use shall <br />not exceed 19.31 acre -feet of which 2.83 acre -feet is due to evaporation loss, <br />16.48 acre -feet is industrial consumptive use. Documentation of exposed surface <br />area may be required by the Division Engineer in the form of an aerial photo <br />evaluation or survey by a Professional Land Surveyor during the plan year or in <br />subsequent years covered by renewals of this plan. Any increases in depletions <br />must be submitted to this office as an amendment to this plan. <br />5. Replacement water is to be supplied by the Applicants NT Arapahoe Entitlement <br />and leased water from Pioneer's NNT Arapahoe Entitlement and will be delivered <br />according to the schedule included in this plan (see attached Table 3) subject to <br />modification by the Division Engineer or Water Commissioner. At no time shall the <br />total appropriation from the well under the combined appropriations of Permit Nos. <br />26943 -F and 64792 -F exceed 21.45 acre -feet annually for this plan. Of the 21.45 <br />acre -feet pumped into the pond, 0.48 acre -feet attributable to the 4% <br />relinquishment for the NNT right shall either be delivered to a recharge pit or to the <br />stream channel adjacent to the pond. Although potentially 20.97 acre -feet is <br />available from the two sources, the total water pumped from the pond shall not <br />exceed 19.31 acre -feet annually unless coordinated with and accepted by the <br />Water Commissioner. The replacement water for this plan and Pioneer's plan shall <br />
The URL can be used to link to this page
Your browser does not support the video tag.