Laserfiche WebLink
Month <br />Percent of <br />Aggregate <br />Production <br />Aggregate <br />Production <br />(tons) <br />Water <br />Retained <br />in Product <br />(ac -ft) <br />Water Used <br />Dust Control <br />Gravel Operation <br />(ac -ft) <br />Water Used For <br />Dust Control <br />Granite Quarry <br />(ac -ft) <br />Operational <br />Consumptive <br />Use <br />(ac -ft) <br />Evaporative <br />Consumptive <br />Use <br />(ac -ft) <br />Total <br />Depletion <br />(ac -ft) <br />_ <br />Oct -11 <br />5.7% <br />22,916 <br />0.34 <br />0.57 <br />0.00 <br />0.91 <br />0.35 <br />1.26 <br />Nov -11 <br />6.3% <br />25,301 <br />0.37 <br />0.63 <br />0.00 <br />1.00 <br />0.19 <br />1.19 <br />Dec -11 <br />4.0% <br />15,958 <br />0.23 <br />0.40 <br />0.00 <br />0.63 <br />0.00 <br />0.63 <br />Jan -12 <br />0.0% <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Feb -12 <br />0.0% <br />0 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Mar -12 <br />5.8% <br />23,257 <br />0.34 <br />0.58 <br />0.00 <br />0.92 <br />0.26 <br />1.18 <br />Apr -12 <br />11.7% <br />46,720 <br />0.69 <br />1.17 <br />0.00 <br />1.86 <br />0.42 <br />2.28 <br />May -12 <br />10.6% <br />42,265 <br />0.62 <br />1.06 <br />0.00 <br />1.68 <br />0.59 <br />2.27 <br />Jun -12 <br />9.9% <br />39,451 <br />0.58 <br />0.99 <br />0.00 <br />1.57 <br />0.78 <br />2.35 <br />Jul -12 <br />16.7% <br />66,647 <br />0.98 <br />1.67 <br />0.00 <br />2.65 <br />0.75 <br />3.40 <br />Aug -12 <br />16.7% <br />66,647 <br />0.98 <br />1.67 <br />0.00 <br />2.65 <br />0.65 <br />3.30 <br />Sep -12 <br />12.7% <br />50,836 <br />0.75 <br />1.27 <br />0.00 <br />2.02 <br />0.52 <br />2.54 <br />Total <br />100% <br />400,000 <br />5.89 <br />10.00 <br />0.00 <br />15.89 <br />4.51 <br />20.40 <br />Table -2 <br />Front Range Aggregates, LLC <br />Parkdale Project M -97 -054 <br />Substitute Supply Plan - Operational Losses for water hauled off -site <br />1 <br />2 <br />Total Material Mined = <br />Moisture Content = <br />Gravel Pit Dust Control = <br />Granite Quarry Dust Control = <br />3 <br />400,000 <br />2.0% <br />10.00 <br />0.00 <br />tons <br />ac -ft <br />ac -ft <br />4 <br />Notes <br />(1) Based on actual mining activity from 2009 -2010. <br />(2) Equals column (1) • Total Material Mined. <br />(3) Equals column (2) • Moisture Content' (2000 / 62.4) /43,560. <br />(4) Gravel operation dust control projected figures based on increase from previous years <br />(5) Granite quarry not operational; no dust control use <br />(6) Equals column (3) + column (4) + column (5). <br />(7) Taken from Table No. 1 <br />(8) Total Depletions equal column (6) + column (7) <br />(5) <br />(6) <br />Total Depletion = <br />Applegate <br />Group, <br />( <br />20.40 <br />( <br />acre -feet <br />