Laserfiche WebLink
lwl.S .S <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866.3567 <br />FAX: (303) 832 -8106 <br />I RECITALS <br />STATE OF COLORADO <br />RECEIVED <br />Nov 07 2011 <br />Division of Reclamation, <br />Mining & Safety <br />TRANSFER OF NIINERAL APPLICATION AND <br />SUCCESSION OF PERM11 APPLICANT <br />COLORADO <br />D IV I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />RECEIVED <br />JAN 12 2012 <br />A. On May 20 2011 , the Division of Reclamation, Mining and Safety within thC)Ivi$lon of Reclamation <br />Colorado Department of Natural Resources (the "State ") deemed an application complete for a mining Mining & Safety <br />operation under C.R. S. 34 -32 -101 et seq. or 34- 32.5 -101 et seq. from <br />Weeminuche Construction Authority <br />____ (the "Applicant "), 3051ndusinal Parkway Towac CO 81334 (address), <br />and assigned Permit Application Number M- 2011 -028 <br />B The Applicant wishes to assign the pending Application to Oldcasile SW Group Inc dba FOUR CORNERS MATERIALS (the <br />"Successor "), 6699 CR 521, P.O. Box 1969, Bayfield, CO 81122 (address), as Successor <br />Applicant and the Successor wishes to become Successor Permittee after all requirements of 34 -32 -101 et seq. or <br />34- 32.5 -101 et seq. are met and the permit inay be issued. <br />C. Successor understands that the permit application process is not complete and is willing to assume full <br />responsibility for the completion of the permitting process prior to the successor conducting mining operations at <br />the site. <br />11. AGREEMENTS <br />Applicant and Successor hereby agree, for their own benefit and for the benefit of the State, such agreements to <br />be effective immediately upon the approval by the State of the transfer of the Application from Applicant to <br />Successor, as fo:lows. <br />1. Successor has inspected the proposed site of the mining and reclamation operations and is fully aware of the <br />condition thereof Successor has examined the Application for the permit and is billy aware of its contents and <br />status in the permitting process. Successor thus understands and accepts the Application as it currently exists. <br />2. Successor understands the permit for this Application cannot be issued until all applicable requirements of <br />34 -32 -101 et se or 34- 32.5 -101 et sec . are met <br />3 Successor understands that all commitments and obligations of the Applicant to the Mined Land <br />Reclamation Board relaTed to this permit application become those of the Successor. <br />4 Successor represents to the State that, to the best of its knowledge, information and belief, it is not in <br />violation of any of the provisions of the Colorado Mined Land Reclamation Act with respect to any other operation <br />conducted by it in the State of Colorado. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand junction • Durango Active and Inactive Mane, <br />