Laserfiche WebLink
Jared Dains <br />May 21, 2012 <br />Page 4 <br />substitute water supply plan. This decision shall not bind the State Engineer to act in <br />a similar manner in any other applications involving other plans or in any proposed <br />renewal of this plan, and shall not imply concurrence with any findings of fact or <br />conclusions of law contained herein, or with the engineering methodologies used by <br />this applicant. <br />Acceptance of these conditions shall be assumed unless a letter to the contrary is received <br />by this office, the Division Engineer (Steve Witte, 310 E. Abriendo Ave., Suite B, Pueblo, CO <br />81004) and the Water Commissioner (Doug Hollister, 4255 Sinton Road, Colorado Springs, CO <br />80907) within two weeks of your receipt of this letter. Please contact Caleb Foy of this office or <br />Justin Zeisler in Pueblo at (719) 542 -3368, if you have any questions concerning this approval. <br />Sincerely, <br />Heidi Frey, P.E. <br />Team 237 Leader <br />Attachments: Tables 2 & 4 <br />Water Accounting Forms <br />cc: Steven J. Witte, Division 2 Engineer <br />Doug Hollister, Water Commissioner, Water District 10 <br />Justin Zeisler, Augmentation Coordinator <br />Division of Reclamation, Mining and Safety <br />HCF /crf: M -82 -155 Fountain Pit 2012.docx <br />