Laserfiche WebLink
Table 3 <br />LAGGED DEPLETIONS AND PROPOSED REPLACEMENTS <br />Evans #2 Pit <br />2012 Plan Year <br />( I ) (2) e1) n, <br />Plan Year <br />2012 <br />Month <br />Net <br />Evaporative <br />Losses <br />(acre -feet) <br />Total <br />Operational <br />Losses <br />(acre -feet) <br />Total <br />Losses <br />from <br />Evans #2 Pit <br />(acre -feet) <br />Lagged <br />Stream <br />Depletions <br />(acre -feet) <br />AGUA <br />Replacement <br />Credits <br />(acre -feet) <br />April -12 <br />1.79 <br />3.02 <br />4.81 <br />1.42 <br />1.60 <br />May -12 <br />2.36 <br />3.02 <br />5.38 <br />2.27 <br />2.40 <br />June -12 <br />2.94 <br />1.55 <br />4.48 <br />2.83 <br />3.00 <br />July -12 <br />2.78 <br />l .55 <br />4.33 <br />3.07 <br />3.20 <br />August -12 <br />2.47 <br />1.55 <br />4.02 <br />3.25 <br />3.30 <br />September -12 <br />2.01 <br />1.55 <br />3.56 <br />3.32 <br />3.40 <br />October -12 <br />1.43 <br />1.55 <br />2.98 <br />3.27 <br />3.30 <br />November -12 <br />0.78 <br />0.00 <br />0.78 <br />2.95 <br />3.00 <br />December -12 <br />0.56 <br />0.00 <br />0.56 <br />2.38 <br />2.40 <br />January -13 <br />0.59 <br />0.00 <br />0.59 <br />2.00 <br />2.00 <br />February -13 <br />0.71 <br />0.00 <br />0.71 <br />1.74 <br />1.80 <br />March -13 <br />1.02 <br />1.55 <br />2.56 <br />1.74 <br />1.80 <br />Total <br />19.42 <br />15.33 <br />34.75 <br />30.24 <br />31.20 <br />Notes: <br />(1) Equals Column (7), Table 1. <br />(2) Equals Column (4), Table 2. <br />(3) Equals the sum of Columns (1) and (2). <br />(4) Based on Glover Calculations (T= 100,000; s =0.2, X =2400; W= 5000). <br />(5) Fully Consumable recharge credits from AGUA's Excelsior Recharge Ponds <br />Deere & Ault Consultants, Inc. 12121/2011 PA0183 Evans #2 Pit \008 2012 SWSP Renewal \2012 Evans #2 SWSP Tables.xls <br />