My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-17_PERMIT FILE - C1981012 (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2012-05-17_PERMIT FILE - C1981012 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:46 PM
Creation date
5/22/2012 8:20:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
Permit File
Doc Date
5/17/2012
Section_Exhibit Name
EXHIBIT 27 SPILL PREVENTION CONTROL AND COUNTERMEASURE PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 2012 <br />6.0 REQUIRED FACILITY IMPROVEMENTS <br />Page 6 -1 <br />The Professional Engineer's certification of this plan is contingent on the following facility <br />improvements being implemented for compliance with SPCC regulations 40 CFR 112: <br />1. Acquire additional spill pallets or similar containment for smaller containers. Stacking <br />5- gallon buckets three to four high defeats the purpose of a spill pallet. <br />2. Tidy up oil house — properly dispose of empty containers, used oil filters, miscellaneous <br />containers of used oil, etc. <br />3. Dispose of/clean up 55- gallon drums located outside used oil containment area and <br />maintain good housekeeping procedures. <br />4. Install proper signage per the SPCC Plan near ASTs. <br />5. Apply proper and consistent labels that describe the contents of all ASTs. <br />6. Install barriers or similar protective devices around the diesel stock tank. <br />7. Install bollards or similar protective devices around used oil tanks. <br />8. Mount and label fire extinguishers around all tanks. <br />9. Ensure that all drains to secondary containments are secured to prevent accidental <br />draining. <br />10. Have the tanks inspected by a certified STI /API inspector. Depending on inspections <br />results, the following may be recommended: <br />• Different/emergency venting <br />• Corrosion protection <br />• Identify and implement an inspection schedule <br />11. Install gauges /alarms as discussed in Section 4.3.8. <br />12. Ensure that hoses are placed inside the containment when not in use. <br />SPCC Plan <br />MR 115 Page 27 -26 Rev. May 2012 <br />
The URL can be used to link to this page
Your browser does not support the video tag.