Laserfiche WebLink
13. Attach a map to this report that accurately depicts the permit boundary, current affected area boundary and location of <br />the acreages specified in items 7- 12 and 14. Please check the appropriate response below: <br />UPDATED MAP ATTACHED: CONDITIONS UNCHANGED - PREVIOUS MAP ACCURATE: X <br />14. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO /A <br />If "YES ", indicate the weed species, control area, control type, application rate and treatment date on the repo map. <br />15. Is adequate topsoil reserved for reclamation, based on your approved permit? <br />If "NO ", please explain: <br />16. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br />If "NO" please explain: <br />17. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the <br />Engineer (Well Permit, S.W. S.P., and /or Permanent Augmentation Plan)? YES NO <br />18. Are all hazardous materials stored within approved spill containment structures? <br />19. Is your financial warranty value sufficient to cover the cost to complete reclamation? <br />20. Is your basis for legal right to enter still valid? <br />4/20 z <br />Signa Je of Corporate Officer, Owner, or Documented Design' e Date <br />YES NO /A) <br />YES NO <br />YES NO CAD <br />YES NO /AD <br />NO <br />21. Does your permit require you to submit monitoring information annually? <br />If "Yes ", please attach the required monitoring results to this annual report. <br />Division records indicate the following permittee contact information. If this information is not current, please type or <br />print current contact information: <br />YES NO N/A <br />I, the undersigned, hereby state that the information provided in this report is true and accurate, and that site operations <br />are being conducted in accordance with the Division approved mining and reclamation plans. <br />Permittee Contact: <br />j cd I mi k (Is <br />Permittee Company: <br />Mdiv-E 1144. rle,+i'a Nla-fe <br />t i (s IT c <br />Address: <br />i 600 k i t T c t - r + a 12-0" <br />I Po-t+ Co a c ri s , CO gOS Z/ <br />Phone Number: <br />C.k - 7v - 7-7_- - 4 O <br />Fax Number: <br />c1 -10 — qr7 _ 39 00 <br />Email Address: <br />( ( <br />13. Attach a map to this report that accurately depicts the permit boundary, current affected area boundary and location of <br />the acreages specified in items 7- 12 and 14. Please check the appropriate response below: <br />UPDATED MAP ATTACHED: CONDITIONS UNCHANGED - PREVIOUS MAP ACCURATE: X <br />14. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO /A <br />If "YES ", indicate the weed species, control area, control type, application rate and treatment date on the repo map. <br />15. Is adequate topsoil reserved for reclamation, based on your approved permit? <br />If "NO ", please explain: <br />16. Is the reserved topsoil vegetated/stabilized in accordance with Rule 3.1.9(1)? <br />If "NO" please explain: <br />17. If mining has exposed groundwater, is the site in compliance with the approved mining plan and Office of the <br />Engineer (Well Permit, S.W. S.P., and /or Permanent Augmentation Plan)? YES NO <br />18. Are all hazardous materials stored within approved spill containment structures? <br />19. Is your financial warranty value sufficient to cover the cost to complete reclamation? <br />20. Is your basis for legal right to enter still valid? <br />4/20 z <br />Signa Je of Corporate Officer, Owner, or Documented Design' e Date <br />YES NO /A) <br />YES NO <br />YES NO CAD <br />YES NO /AD <br />NO <br />21. Does your permit require you to submit monitoring information annually? <br />If "Yes ", please attach the required monitoring results to this annual report. <br />Division records indicate the following permittee contact information. If this information is not current, please type or <br />print current contact information: <br />YES NO N/A <br />I, the undersigned, hereby state that the information provided in this report is true and accurate, and that site operations <br />are being conducted in accordance with the Division approved mining and reclamation plans. <br />