My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-18_REPORT - M1982020
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1982020
>
2012-05-18_REPORT - M1982020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:53 PM
Creation date
5/21/2012 4:02:15 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982020
IBM Index Class Name
REPORT
Doc Date
5/18/2012
Doc Name
ANNUAL FEE/REPORT
From
ASPEN MINERAL RESOURCES
To
DRMS
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Total acres <br />Aspen Mineral Resources, Inc. <br />Total acres <br />M- 1982 -020 <br />Total acres <br />Sooner Lucky Strike Mine Ltd <br />Total acres <br />Gunnison <br />backfilled: <br />q <br />seeded w/ <br />0( <br />w /topsoil <br />0 <br />mulched w/ <br />7 <br />approved mix: <br />replaced: <br />approved mulch: <br />Total acres <br />Total acres <br />Topsoil <br />� <br />Mulch application <br />0 <br />graded: <br />fertilized w/ <br />aped fertilizer: <br />j' <br />replacement <br />depth (in.): <br />.J <br />rate (tons): <br />0' <br />Seed <br />Fertilizer <br />Mulch <br />application <br />iv <br />application <br />i fjf4 <br />application <br />0 P/A_ <br />method: <br />, y <br />method: <br />method: <br />Pennittee Name: <br />Aspen Mineral Resources, Inc. <br />Permit Number: <br />M- 1982 -020 <br />Operation Name: <br />Sooner Lucky Strike Mine Ltd <br />County: <br />Gunnison <br />Annual Fee Due: <br />$259.00 <br />Anniversary Date: <br />May 25, 2012 <br />Permit Acreage: <br />2.00 <br />C Bond Amt: <br />$43,094.43 <br />110(2) Annual Report <br />According to C.R.S. 34-32.5 -116 or 34-32 -116, each year, on the anniversary date of the permit, an operator shall submit <br />the Annual Fee, an Annual Report and Map showing the extent of current disturbances to affected land, required <br />monitoring information, reclamation accomplished to date and during the preceding year, any new disturbance that is <br />anticipated to occur during the upcoming year, any reclamation that will be performed during the upcoming year, the <br />dates for the beginning of active operations, and the date active operations ceased for the year. <br />Information contained in this report will be reviewed by the Division upon receipt and prior to the next compliance <br />inspection of the site. If, while completing this report, you learn that your site is not in compliance with the rules and the <br />act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the site identification sign posted in accordance with Rule 3.1.12(1). <br />2. Is the affected area boundary clearly marked in accordance with Rule 3.1.12(2). <br />3. Is the mine site in final reclamation (all material extraction and stockpile removal is complete)? <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />4. What was the date of last excavation, processing or hauling activity at the mine? <br />5. Does the mine operate more than 180 days per year <br />If "NO ", please review Rule 1.13 to assure that your mine is in compliance. <br />6. Has this mine been granted: a) approval of TEMPORARY CESSATION Status? <br />b) approval for INTERMITTENT OPERATION? <br />7. Number of acres currently affected (mining + incomplete and or unreleased reclamation). <br />8. Number of acres that were newly affected during the current report year. . 1S <br />t4 4cs +/ <br />9. Number of acres that were reclaimed during the current report year. <br />10. Estimated new acreage to be affected in the next report year. <br />11. Estimated acres to be reclaimed in the next report year. <br />12. Total acres in various stages of reclamation, since permitted mining activities began: <br />YES <br />YES <br />pre <br />Page 2 of 3 <br />NO <br />NO <br />
The URL can be used to link to this page
Your browser does not support the video tag.