My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-17_ENFORCEMENT - C1996083
DRMS
>
Day Forward
>
Enforcement
>
Coal
>
C1996083
>
2012-05-17_ENFORCEMENT - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:46 PM
Creation date
5/18/2012 7:11:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Enforcement
Doc Date
5/17/2012
Doc Name
Extension of Time for Abatement Notice of Violation
From
DRMS
To
Bowie Resources, LLC
Violation No.
CV2012004
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OF C pGp\ <br />\ W*/ <br />x X810 <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFETY <br />1313 Sherman Street, Room 215, Dem-er, Colorado 80203, (303) 866 -3567 <br />EXTENSION OF TIME FOR ABATEMENT NOTICE <br />FOR NOTICE OF VIOLATION OR CESSATION ORDER FOR COAL OPERATION <br />TO: THE OPERATOR AND PERMITTEE OF THE MINE DESCRIBED BELOW <br />CESSATION ORDER NO.: NOTICE OF VIOLATION NO.: CV- 2012 -004 <br />DATE NOV OR CO ISSUED: May 1, 2012 PERMIT NO.: C- 1996 -083 <br />MINE: Bowie No. 2 <br />OPERATOR (IF OTHER THAN PERMITTEE) <br />MAIL ADDRESS: <br />COUNTY: Delta Cou <br />TYPE OF MINE: Underground <br />PERMITTEE: Bowie Resources, LLC <br />MAIL ADDRESS: PO Box 483 <br />Paonia, CO 81428 <br />In (a) Notice of Violation No. CV- 2012 -004 , (b) Cessation Order No. <br />the deadline for abatement of the practice, condition or violation described was fixed at <br />Mav 18. 2012 <br />It is hereby found that the operator has failed to abate such practice, condition or <br />violation, or cannot complete abatement within the time allowed, but that such failure is not <br />due to lack of diligence on the part of the operator. The time for abatement is therefore <br />extended to June 29. 2012 <br />The conditions, practices or violation as to which this extension applies are as follows: <br />Abatement 1. Remove the coal mine waste from the edae of the outsloae of Gob Pile No. 4. remove the <br />CMW that flowed down the outsloae of Gob Pile No. 4. restore all lateral ditches on the outsloae of Gob Pile <br />No. 4 and restore collection ditch D -D3 to the desian standards. <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />By <br />(Signature of Authorized Representative) <br />Date of Issue: May 17, 2012 <br />[Signature of Division Director, if extension is <br />beyond 90 days, pursuant to Rule 5.03.2(2)(e)]* <br />*The Division's justification for approving the <br />extension beyond 90 days is attached. <br />Brock Bowles, Environmental Protection Specialist <br />(Please print name and title) <br />WHITE - File <br />YELLOW - Operator <br />PINK - Specialist <br />m: \coal \share \forms \Ext Abate <br />
The URL can be used to link to this page
Your browser does not support the video tag.