Laserfiche WebLink
Sutey Refuse Pile <br /> • Station #GS-1 <br /> • Station #GW-1 <br /> • Warehouse, Station #6 <br /> • Tunnel Refuse Pile, Station #11 <br /> • Washplant, Station#9 <br /> Ground-water samples are analyzed for the following: <br /> Field Lab <br /> Depth Bicarbonate <br /> Temperature Calcium <br /> pH Carbonate <br /> Conductivity Chloride <br /> Iron <br /> Magnesium <br /> Mercury <br /> NA <br /> SAR <br /> Solids (TDS) <br /> Sulfate <br /> Precipitation <br /> Monthly precipitation totals for the year have been included. <br /> ANNUAL REPORT - RECLAMATION <br /> During 1992 pumping and ventilation of underground workings ceased. A contractor was <br /> employed to sell and remove surface facilities, and work began to dismantle such facilities. <br /> This work was interrupted by the onset of winter, which brought heavy snow. <br /> No additional acreages were disturbed, and none were topsoiled or seeded. <br /> Annual Report 1992 <br /> Coal Basin Mine <br />