My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (133)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (133)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 1:10:37 AM
Creation date
5/17/2012 9:04:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
1987 Annual & Hydrology Report (part 10)
From
Mid-Continent Resources
To
DRMS
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
October 15, 1987 MR-6. Temporary Seed Mix <br /> October 26, 1987 MR-7. Sutey Conveyor Area Expansion <br /> March 15, 1988 MR-8. Pond Cleanings on Rock Tunnel Pile <br /> March 23, 1088 MR-9. Strip & Stockpile Topsoil - Sutey Site <br /> June 1, 1988 MR-10. Ditch Design at Sutey Conveyor Site <br /> June 30, 1988 MR-11. Winter Storage - Non-Coal Waste <br /> August 12, 1988 MR-12. Install Ventillation Fan - No. Mine <br /> October 20, 1988 MR-13. Extend Sutey Topsoil Pile <br /> January 13, 1989 MR-14. Clear Powerline Right-of-Way <br /> April 6, 1989 MR-15. Pipeline Diversion-Rock Tunnel Ponds <br /> May 16, 1989 MR-16. Sutey Topsoil Pile Culvert <br /> June 28, 1989 M R-17. Sediment Control - Sutey Topsoil Pile <br /> July 1, 1989 MR-18. Pond Cleanings on Tunnel Waste Pile <br /> June 30, 1989 MR-19. Aluminum Sulfate - Tunnnel Ponds <br /> July 7, 1989 MR-20. Use of NALCO 7883 in Sediment Ponds <br /> July 14, 1989 MR-21. Use of Guargum in Sediment Ponds <br /> August 9, 1989 MR-22. Overland Conveyor Site Drainage <br /> August 25, 1989 MR-23. Dutch Creek Channel Repair <br /> August 31, 1989 MR-24. Pipeline for Water Treatment Facility <br /> October 26, 1989 MR-25. Brieden Plant Expansion <br /> 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.