My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-01-30_PERMIT FILE - C1996083A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1996083A
>
2012-01-30_PERMIT FILE - C1996083A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:48:05 PM
Creation date
5/16/2012 8:52:13 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083A
IBM Index Class Name
Permit File
Doc Date
1/30/2012
Doc Name
pages 2.05-84 to 2.05-165
Section_Exhibit Name
2.05 Operation and Reclamation Plans Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 2.05.6(6) <br />C <br />Subsidence Monitoring <br />Monument Location <br />Frequency <br />Purpose <br />17 -A Hubbard Creek <br />Quarterly <br />To confirm subsidence does not <br />occur in the limited extraction zone <br />along Hubbard Creek. B -8 Panel, <br />the last panel adjacent to Hubbard <br />Creek, was complete by the end of <br />2009. Monitoring will cease at the <br />end of 2011 which is two years after <br />the B -8 panel was complete. <br />To determine subsidence over <br />multiple seam mining. The <br />subsidence monuments will have <br />pre - longwall mining base line <br />measurements, post D Seam <br />longwall mining measurements and <br />post B Seam longwall mining <br />measurements. <br />Monitoring of these 20 monuments <br />will be quarterly through 2007 and <br />quarterly in 2009 at which time <br />monitoring of the 20 monuments will <br />cease. <br />17 -B Hubbard Creek <br />Quarterly <br />17 -C Hubbard Creek <br />Quarterly <br />17 -D Hubbard Creek <br />Quarterly <br />17 -E Hubbard Creek <br />Quarterly <br />17 -F Hubbard Creek <br />Quarterly <br />" <br />24-0 <br />24 -E Monuments are <br />24 -F located above <br />24 -G the west D -Seam <br />25 -A and west B- <br />25 -B Seam panels. <br />25 -C The D -Seam <br />25 -D panels were <br />25 -E numbered WD -1, <br />25 -F WD -2 & WD -3 <br />26 -A and were mined <br />26 -B from 3/04 to <br />26 -C 3/05. The B- <br />26 -D Seam panels <br />26 -E were numbered <br />26 -F B -1, B -2 & B -3 <br />26 -G and were mined <br />27 -A from 4/05 to <br />27 -B 10/06. <br />27 -C <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />Quarterly <br />37 -A <br />Terror Creek <br />Quarterly <br />To confirm subsidence does not <br />occur in the limited extraction zone <br />along Terror Creek or the <br />Transmission Line <br />37 -B <br />Terror Creek <br />Quarterly <br />37 -C <br />Transmission <br />Line Towers <br />Quarterly <br />37 -D <br />Quarterly <br />0 ' Seasonal access difficulties usually restrict quarter monitoring to three times per year. <br />PR -12 2.05-163- 11/10 <br />A PPRovEJ� <br />�t��6 /1b <br />
The URL can be used to link to this page
Your browser does not support the video tag.