My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-15_INSPECTION - M1977342
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977342
>
2012-05-15_INSPECTION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:43 PM
Creation date
5/15/2012 3:28:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
INSPECTION
Doc Date
5/15/2012
Doc Name
INSPECTION REPORT
From
DRMS
To
CLIMAX
Inspection Date
4/20/2012
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OBSERVATIONS <br />PERMIT #: M- 1977 -342 <br />INSPECTOR'S INITIALS: PSH <br />INSPECTION DATE: April 20, 2012 <br />The Henderson Mine, File No. M- 1977 -342, was inspected by Peter Hays with the Division of Reclamation, <br />Mining and Safety (Division) in response to the submittal of Construction Certifications and As -Built Drawings <br />for the "ultimate" clean water interceptor canal. Mr. Miguel Hamarat with Climax Molybdenum (Climax) was <br />present during the inspection. <br />Climax Molybdenum Company submitted the construction certification and as -built drawing for the ultimate <br />canal on March 21, 2012. The initial construction of the canal was approved by the Division on July 18, 2006. <br />The interceptor canal is part of the Environmental Protection Plan (EPP) original submitted as part of Technical <br />Revision No. 4 (TR -04). <br />W.W. Wheeler & Associates, Inc. provided a letter, dated March 9, 2012, documenting the Ultimate Canal was <br />constructed in general conformance with the approved design and detailed exceptions to the original design. <br />The canal was inspected from south to north with specific attention paid to the "improvement" areas detailed <br />in the Wheeler certification letter by the Division. <br />The Division requested a full set of original 2007 as -built drawings and detail drawings for the revised sections <br />be submitted to the Division. Mr. Hamarat stated he would check on the availability of the original drawings <br />and if revised drawings other than Drawing No. UC -1 -01, which was submitted with the March 21, 2012 letter, <br />were created for the modified portions of the canal. <br />Henderson submitted a copy of the As -Built Drawings for Original Construction of Ultimate Canal on May 10, <br />2012. <br />No problems were noted during the inspection. Photographs from the inspection are attached. <br />Inspection Contact Address <br />Miguel Hamarat <br />Climax Molybdenum Company <br />19302 County Rd. #3 <br />Parshall, CO 80468 <br />Cc: Tom Kaldenbach; DRMS <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.