Laserfiche WebLink
GROUND WATER MONITORING - REFUSE PILE <br /> Eight ground water monitoring wells have been installed <br /> above, within and downslope from the coal processing waste rile at <br /> locations approved by the Division. One well is above, one below <br /> and six within the waste pile. They are cased with 2" P .V.C. tubing <br /> with the lower section perforated. <br /> Monitoring on a monthly basis commenced in October 1982 . <br /> Mid-Continent agrees that if the monitoring results demonstrate <br /> that the ground water conditions encountered within the coal <br /> processing waste pile differs significantly, in the opinion of <br /> the Division, from those assumptions made in completing the <br /> stability analysis , the analysis shall be revised appropriately. <br /> If a revised stability analysis suggests that design revisions <br /> are necessary in order to achieve a static slope safety factor in <br /> excess of 1. 5 , the appropriate design revisions and plan revisions <br /> shall be accomplished by the company in an expeditious manner. <br /> (Stipulation 24) <br /> 1-21 (Vol. 3, Chap. II, App. II-B-8) <br />