Laserfiche WebLink
r <br /> 2.0 TOPSOIL <br /> 2.1 GENERAL <br /> 2.1.1 TO <br /> PSOIL FROM THE POND AREA HAS BEEN STRIPPED ANT STOCKPILED . <br /> CKPILED . <br /> STOCKPILED TOPSOIL ND REDI�TRIBUTION MATERIALS <br /> A REGRADED AREA. <br /> MOVED <br /> UNTIL REQUIRED, FOR <br /> 2.2 REDISTRIBUTION <br /> 2,2. 1 AFTER FINAL GRADING AND BEFORE THEREPLACEMENTEOFBTOPSOIL AND L <br /> OTHER MATERIALS, REGRADED LAND SHALL <br /> MEANS TO A SUFFICIENT DEPTH V�DELFORNROOTSPENETRATIONS' RE- <br /> LIEVE COMPACTION, AND TO PRO <br /> 2,2.2 TOPSOIL AND OTHER MATERIALS SHALL BE REDISTRIBUTED IN A MANNER <br /> THAT : STABLE THICKNESS <br /> (A) ACHIEVES AN APPROXIMATE UNIFORM, <br /> CONSISTENT WITH POSTP'IINI LAND <br /> ANDUSES, <br /> REQUIREMENTSCONTOURS, <br /> OFTHERE- <br /> SURFACE WATER DRAINAGE SYSTEf`9 <br /> VEGETATION; <br /> (B) PREVENTS EXCESS COMPACTION AND CONTAMINATION OF TOPSOIL: <br /> (C) MINIMIZES DETERIORATION OF THE B.OPSOILCAANDCHEMICAL, <br /> AND PHYSICAL PROPERT OF THE <br /> _ (D) PROTECTS THE TOPSOIL <br /> FROM <br /> AND BEFORE AND <br /> ANDWATER <br /> AFTEREROSION <br /> IS <br /> DURING REDISTRIBUTION <br /> SEEDED AND PLANTED <br /> 3.0 INSPECTIONS <br /> 3.1 SEDIMENTATION PONDS HALL BE 3,1,1 THE SEDIMENTATION PONDS SRUCTION BYSAEQUALIFIEDCTED N REGISTERED <br /> TiOf� <br /> AND CERTIFIED AFTER CONST <br /> PROFESSIONAL ENGINEER, OR PERSON APPROVED BY CMLRD , <br /> 3.1.2 CERTIFICATION OF THE CONSTRUCTED <br /> DIVISON SHALL <br /> IMM�IATELYAFOLLOWRDED �NG <br /> COLORADO MINED LAND RECLAMATION <br /> CONSTRUCTION. <br />