Laserfiche WebLink
DUTCH CREEK CHANNEL DIVERSION TUNNEL REFUSE FILL <br /> The channel relocation has not been accomplished because <br /> delays in the tunnel construction has resulted in sufficient room <br /> being available for deposit of rock. Now that tunnel construction <br /> has been resumed, and before the channel relocation construction <br /> commences, construction designs indicating a capacity at least <br /> equal to the capacity of the unmodified channel immediately <br /> upstream and downstream from the reconstructed channel will be <br /> submitted to the Division for approval by December 31, 1983 . <br /> NOTE : This requirement (Stipulation 7A) has <br /> been cancelled by MLRD . <br /> (Stipulation 7A) <br /> 14 (Vol. 3 , App. II-B-7 , Att. 4) <br />