Laserfiche WebLink
• r 1,11I)-C NTIXE\T RESOURCES. INC <br /> 'J 11 Cxntcnnwl tit_5unc 41 N <br /> Urawcr 1u 1''-" <br /> Glenwood SNnnp, Colorado 8](A)1 <br /> (N O 945-4958 <br /> March 29, 1982 <br /> Jim Herron <br /> Mined Land Reclamation Division <br /> 423 Centennial Building <br /> 1313 Sherman Street <br /> Denver, CO 80203 <br /> RE: Coal Basin Mines - File No. C-017-81 <br /> (File in the front of Volume 3 , App. II-B-7) <br /> Dear Jim: <br /> Enclosed are comments on sediment control structure questions <br /> in your letter of February 24 , 1982. <br /> Mines 1 & 2 <br /> 1 . Second Pond at No. 1 Pond <br /> A second or primary pond was constructed at the <br /> site to help alleviate the problem of removing the <br /> super fines that have been prevalent at this location. <br /> Enclosed is a sketch showing the placement of this pond <br /> and sizing. (40 'x70'x6 '=0. 4A.F. ) 18" cmp discharge <br /> pipe into second pond. <br /> 2 . Small pond on north end of pad No. 4 . <br /> This pond was never constructed,. see II-B-App. 7- <br /> Att.1 , Exhibit 2 which shows correct drainage from pad <br /> No. 4 . The small pond shown on Exhibit 1 has been <br /> deleted. <br /> 3 . Diversion ditches, conduit conveyance pipes No. 1 <br /> & 2 pads. See Volume 3 , App. II-B-7 , Pages 17' thru 39 <br /> and maps II-B-App. 7-Att. 1, Exhibit 1, 2 and 3 . <br /> 4 . Pond spillway and dewatering <br /> a. Dewatering of this pond is by pump. <br /> b. A"spillway will be constructed in the west <br /> corner of the dam (See sketch item 1. ) . This will be <br /> an invert type spillway constructed of rock rip rap. <br /> The dimensions will be, one foot deep and four feet <br /> across the bottom and five feet across the top (lx4.5' <br /> =4 .5 sq.ft. at 1. 5 FPS = 6.75 cfs. discharge) <br /> (Stipulations 1 , 2 & 3) <br /> 60 (Vol . 3, App. II-B-7 , Att. 1) <br />