My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (109)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (109)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 1:01:55 AM
Creation date
5/15/2012 10:20:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Hydrologic Control Plan
Section_Exhibit Name
Chapter II Appendix II-B-7
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
o <br /> Z'13 Colorc_do —ve. <br /> GIE3,.roccI CO 81COl <br /> September 27, 1991 <br /> Dan Mathews <br /> mined Land Reclamation Division <br /> 1313 Sherman <br /> Room 215 <br /> Denver, CO 80209 <br /> RE: TR-18. Response to Joe Dudash' memo of 9/18/91 <br /> Dear Mr. Mathews: <br /> In Joe Dudash's memo concerning review of the designs for secondary <br /> spillways Mid-Continent was asked to respond on several points. <br /> Riprap design. <br /> Riprap material shall be of free-draining, durable rock, <br /> varying in size, with the average, D,, = 8 inchas. <br /> Mid-Continent proposes to place a layer of smaller, <br /> gravel to cobble size rock beneath the larger reek: <br /> material . <br /> As indicated in the June 21 submittal , riprap would be <br /> placed to a depth of 1 foot at the bottom and sides of <br /> the spillway channel , down the outside slope of the <br /> embankment. <br /> Mid-Continent proposes placement of riprap material at <br /> all ponds included in this request for revision excert <br /> the load-out pond. Mid-Continent does not believe r4p <br /> rap will be required at the Ioadout pond as it has no <br /> outslope, and is of concrete construction. <br /> Recertification of the ponds on completion of <br /> construction. <br /> 48 1J 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.