Laserfiche WebLink
II-B-7 <br /> SUTEY REFUSE DISPOSAL AREA <br /> INDEX - SUTEY REFUSE DISPOSAL AREA <br /> COAL BASIN MINE SITE <br /> Permit Location Reference Pg <br /> Vol . 2 App. II-B-5 Stream Channel Diversion Ditch 24 . 2 <br /> Sutey Topsoil Pile Perimeter Ditch 31 <br /> Design Modifications - Phase II - 39 <br /> Sutey - Golder & Associates 5/86 <br /> Design of Collection Ditches 42 <br /> Design of Sedimentation Pond 52 <br /> Capacities <br /> Spillways 55 <br /> Vol . 2 App. II-B-5 Sutey Refuse Pile Expansion T.R. 8 57 <br /> 5/87 <br /> West Collection Ditch Design 133 <br /> Spillways 136 <br /> Ditches 141 <br /> Vol . 2 App. II-B-5 Refuse Pile Expansion - Third Pond 129 <br /> Site Drainage Calculations <br /> Vol . 2-A II-B App. Construction Drawings - Phase II M <br /> 5-1 Waste Disposal Site - Index/General <br /> Notes Golder Assoc. 4/86 <br /> Vol . 2-A II-B App. Runoff Diversion Phase I & II M <br /> 5-3 Conveyor Construction <br /> Vol . 2-A II-B App. Stream Diversion & Runoff M <br /> 5-4 Collection Channels <br /> Vol . 2-A II-B App. Sedimentation Ponds M <br /> 5-4 <br /> Vol. 2-A II-B App. Access Roads M <br /> 5-7 <br /> Vol . 2-A II-B App. 47-Year Waste Disposal Conceptual M <br /> 5-8 Design <br /> Index <br /> Sutey Refuse Disposal Area xi Prepared 6/91 <br />