Laserfiche WebLink
J stipulation No. 4 „�u �`' - <br /> WITHIN TWO MONTHS OF PERMIT APPROVAL, THE PERMITTEE MUST SUBMIT TO THE <br /> DIVISION FOR APPROVAL, A PROPOSED REVEGETATION SUCCESS STANDARD FOR <br /> SPECIES DIVERSITY AND WOODY PLANT DENSITY FOR THE NEW COAL PROCESSING <br /> WASTE EMBANKMENT AREA. APPROVAL OF THIS REVISION MUST BE OBTAINED <br /> WITHIN FOUR MONTHS OF PERMIT APPROVAL <br /> /Stipulation No. 5 ,9u-�e7- <br /> WITHIN ONE MONTH OF PERMIT ISSUANCE THE PERMITTEE MUST SUBMIT TO THE <br /> DIVISION FOR APPROVAL, THE LOCATION OF A REFERENCE AREA FOR THE NEW <br /> COAL PROCESSING WASTE EMBANKMENT PLUS SUFFICIENT INFORMATION TO PROVE <br /> STATISTICALLY THAT THE AREA TO BE DISTURBED AND THE REFERENCE AREA ARE <br /> EQUAL IN COVER AND PRODUCTION. <br /> IF THE PERMITTEE IS UNABLE TO OBTAIN DIVISION APPROVAL OF A REFERENCE <br /> AREA WITHIN THREE MONTHS OF PERMIT ISSUANCE, THE PERMITTEE MUST COMMIT <br /> TO A HISTORIC RECORDS REVEGETATION SUCCESS STANDARD. <br /> Stipulation <br /> THE PERMITTEE MUST CONDUCT A STATISTICALLY VALID REVEGETATION <br /> MONITORING PROGRAM EVERY OTHER YEAR FOLLOWING RECLAMATION OF THE FIRST <br /> SECTION OF THE NEW COAL PROCESSING WASTE EMBANKMENT. EACH ADDITIONAL <br /> AREA REVEGETATED MUST BE INCLUDED IN THE MONITORING PROGRAM DURING THE <br /> THIRD AND SUBSEQUENT GROWING SEASONS. THE SOUTH AND WEST ASPECTS MUST <br /> EACH BE MONITORED SEPARATELY FROM THE NORTH AND EAST ASPECTS PLUS THE <br /> FLAT AREAS. MONITORING MUST CONTINUE OR ALL AREAS REVEGETATED UNTIL <br /> EITHER BOND IS RELEASED OR THE DIVISION APPROVES DISCONTINUATION OF <br /> MONITORING IN WRITING. <br /> IF REVEGETATION MONITORING SHOWS THAT REVEGETATION SUCCESS STANDARDS <br /> ARE NOT BEING MET, AND ARE NOT LIKELY TO BE MET IN SUBSEQUENT YEARS, <br /> THE PERMITTEE MUST MAKE WHATEVER CHANGES IN THE RECLAMATION PLAN THE <br /> DIVISION DEEMS APPROPRIATE AND IMPLEMENT THESE CHANGES ON THE AREAS <br /> WHERE REVEGETATION SUCCESS STANDARDS ARE NOT BEING MET. <br /> Stipulation No. 6 <br /> THE DIVISION DIRECTS THE PERMITTEE TO COMPLETE A THOROUGH GEOTECHNICAL <br /> INVESTIGATION AND STABILITY ANALYSIS OF THE PROPOSED BACKFILLED <br /> CONFIGURATIONS FOR THE FIVE PORTAL BENCHES AT THE COAL BASIN MINES. <br /> THE PURPOSE OF THIS PROJECT SHALL BE TO DEVELOP SPECIFIC BACKFILLING, <br /> GRADING, DRAINAGE, AND RECLAMATION PROCEDURES TO ASSURE OPTIMUM <br /> STABILITY OF THE FINAL RECLAIMED PORTAL BENCHES. <br /> FURTHER, THE PERMITTEE SHALL PREPARE A DETAILED MATERIAL BALANCE, <br /> DESIGNATING THE PROPOSED SOURCE OF MATERIALS TO BE UTILIZED IN <br /> COMPLETING THE BACKFILLING AND GRADING OF THE MINE PORTAL AREAS. <br /> 17 <br />