Laserfiche WebLink
APPENDIX II-13-5 <br /> SUTEY COAL REFUSE DISPOSAL FACILITY <br /> Table of Contents <br /> Section Subject Page <br /> A Summary of Contents of Appendix 1 <br /> B Permit Approvals 2 <br /> 1. Mine Safety and Health Administration Approval 2 <br /> 2. Approval of Short Section Conveyor System 3 <br /> 3. Approval of Ponds, Conveyor and Roads 8 <br /> 4. Permit Revision Findings Document 12 <br /> C Access Road Design 19 <br /> D Plan to Seal Gas Well 25 <br /> E Seed Mix for Disposal Area 26 <br /> F MR for Placement of Sediment Pond Cleanings on Refuse Pile 29 <br /> G TR for Topsoil Pile Perimeter Ditch 31 <br /> H Plan to Stabilize Topsoil Pile 34 <br /> 1 MR for Phase II (1986) Expansion Plan 35 <br /> J Waste Pile Stability Analysis 62 <br /> K TR for Phase 11 (1987) Expansion Plan 85 <br /> L MR for Conveyor Extension 142 <br /> M TR-9, Incidental Permit Boundary Change 145 <br /> N TR-10, for Light Use Road 152 <br /> O MR-9, Strip Topsoil for Sutey Extension 160 <br /> P MR-10, Ditch Design - Sutey Conveyor 161 <br />