Laserfiche WebLink
October 16, 1986 TR-5. Two Additional Mine Discharge Ponds <br /> November 5, 1986 TR-6. Enlarge Tunnel Pad <br /> February 10, 1987 TR-7. Modification of Tunnel Pad Expansion <br /> August 27 , 1987 TR-8. Sutey Refuse Pile Expansion <br /> February 19, 1988 TR-9. Incidental Revision to Permit Boundary <br /> June 30, 1988 TR-10. Construct Light Use Road to Sutey <br /> May 4, 1989 TR-11. Sediment Control at Rock Tunnel Area <br /> October 12, 198 TR-12. Mine Wastewater Treatment Facility <br /> November 17, 1989 TR-13. Waste Piles Drainage Ditch Designs <br /> April 26, 1990 TR-14. Enhance Erosion Control-Prep Plant Area <br /> July 2, 1990 TR-15. Downgrade 3 ,4,&5 Mine Haul Roads <br /> October 4, 1990 TR-16. Route Sutey Subdrain Flow to Ponds <br /> December 21, 1990 TR-17. Mine Water Treatment System <br /> Minor Revisions <br /> April 5, 1983 No. 1 Mine Coal Stockpile Expansion <br /> September 1, 1983 Exploration of Roads For Conveyor Corridor <br /> September 23 , 1983 Change Subsidence Monitoring System <br /> January 18, 1984 Variance - 100 Foot Buffer <br /> April 13 , 1984 Stockpile Coal on Tunnel Refuse Area <br /> June 6, 1984 First Phase - Sutey Conveyor System <br /> Summer, 1984 Arctic Circle Sediment Pond. <br /> September 10, 1984 Revegetation Seed Mix - Conveyor Cooridor <br /> September 11, 1984 Upgrade Light Use Road <br /> September 11, 1984 Modification of Ground Water Monitoring <br /> September 18, 1984 Relocation of Powerline at Preparation Plant <br /> October 3, 1984 Coal Storage on No. 2 Mine Bin Pad <br /> 2 <br />