My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (103)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (103)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 1:17:45 AM
Creation date
5/15/2012 9:22:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Rock Tunnel Project
Section_Exhibit Name
Chapter II Appendix II-B-3 (Part 1 of 2)
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
116
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOTICE <br /> The Colorado Mined Land Reclamation Division has issued a proposed <br /> decision approving a technical revision under the provisions of the <br /> Colorado Surface Coal Mining Reclamation Act of 1979. The revision <br /> was submitted by Mid-Continent Resources, Inc. , P.O. Box 158, Carbondale, . <br /> Colorado 81623, for their mine facility located in Pitkin County <br /> approximately 4 miles west of Redstone, Colorado. The technical revision <br /> covers land in Section 15, T10S, R89W of the 6th P.M. Redstone <br /> Quadrangle. <br /> The Technical revision is for approval to construct a trash pile near <br /> the Rock Tunnel Project waste disposal area. The new trash pile is <br /> needed because the old trash pile near the preparations plant is nearing <br /> capacity. <br /> Copies of the revision can be obtained from the Colorado Mined Land <br /> Reclamation Division, 423 Centennial Building, 1313 Sherman Street, <br /> Denver, Colorado 80203, (303) 866-3567. Any person who has an interest <br /> which is or may be adversely affected may request a formal hearing on <br /> the decision by the Division. These requests must be made within 10 days <br /> of this publication, shall be in writing, and state with reasonable <br /> specificity the reasons for the request and objections to the proposed <br /> decision. <br /> 28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.