Laserfiche WebLink
Appendix II-B-3 <br /> Adit/Rock Tunnel Project <br /> Table of Contents <br /> Section Subject Page <br /> A Summary of Contents of this Appendix 1 <br /> B. Initial Approvals <br /> 1. Mined Land Reclamation Division 2 <br /> 2. Mine Safety & Health Administration 3 <br /> 3. White River National Forest Special Use Permit 4 <br /> C. Geo-Hydro Consulting,lnc. - 1984 Review 12 <br /> D. MR for Variance from 100' Stream Buffer Zone Requirement 23 <br /> E. TR for Rock Tunnel Trash Pile 27 <br /> F MR for Rock Tunnel Sealing Plan 34 <br /> G. TR for Temporary Disposal of Coal Refuse on Tunnel Pile 47 <br /> H. MR for Temporary Disposal of Raw Coal on Tunnel Pile 51 <br /> I. TR for Trommel Screen Waste on Tunnel Pile 55 <br /> J. TR for Conveyor System 60 <br /> K. Supporting Calculations, Rock Tunnel Waste Disposal Area 71 <br /> L. TR-6. Rock Tunnel Pad Expansion (.9 Acre) 142 <br /> M. MR-3. Relocation of Powerline 149 <br /> N. TR-7. for Rock Tunnel Pad Expansion (1.7 Acres) 154 <br /> O. MR-5. Pond "A" Discharge Structure 166 <br /> P. MR-8. Pond Cleanings on Tunnel Pile 168 <br /> Q. MR-9. Solid Non-Coal Waste Disposal 170 <br />