My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (100)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (100)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 12:34:29 AM
Creation date
5/15/2012 8:35:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Operation Plan-Permit Area
Section_Exhibit Name
Chapter IIB
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Chapter II <br /> Golder & Associates verified that the existing sedimation ponds were adequately <br /> sized to meet regulatory requirements for the Phase II Pile, with minor modifications, <br /> when operated in series because the ponds were initially designed very <br /> conservatively so that either pond acting independently would meet regulatory <br /> requirements for the Phase I pile. <br /> The modification recommended was to lower the dewatering hole in the principal <br /> spillway riser pipe on the lower pond by 18 inches in order to meet the runoff <br /> storage requirements of the regulations. <br /> (3) Sutey - Operation and Maintenance. <br /> The disposal site is inspected quarterly by a qualified registered professional <br /> engineer to determine that it is being constructed as specified in the design. <br /> Terraces associated with the coal refuse pile have been designed for structural <br /> stability. During operation, the waste is placed in a controlled manner and <br /> compacted as approved by the department. <br /> The rill and gully maintenance and repair program, approved as a minor revision on <br /> July 24, 1985, says that for the Sutey pile: <br /> As the pile progresses upward a 2:1 outslope will develop. Before topsoiling occurs <br /> the area will be inspected each spring and any rills and gullies noted. As the area <br /> dries out, mechanical equipment will be used to reshape the area. <br /> After topsoiling, inspections to identify erosion problems will be conducted once per <br /> month from May through July. Inspection will also be made after any significant <br /> rainfall event. If any (problems) are noted, temporary control will be established by <br /> hay bales or parts of bales being placed at prudent intervals along the rill or gully <br /> within 10 days of detection. When the refuse pile dries out (generally July or <br /> August), mechancial methods will be used to remove or fill the rills and gullies, <br /> vegetation: i.e., small rubber-tired backhoe or D-3 tractor. In some cases (steep <br /> slope areas) (1:1 only) soil conservation type log or rock check dam structures will <br /> be utilized. All disturbed areas will be reseeded and mulched using hand-broadcast <br /> methods, thus again minimizing any impact to existing vegetation. <br /> Sediment pond cleanings are placed on the Sutey pile, as approved by a Minor <br /> Revision on July 11, 1985, as part of Mid-Continent's normal sediment pond <br /> maintenance program. Usually, such clean-out procedures start about April and <br /> continue on through the snow-free months. The muck from the ponds is <br /> truck-hauled to the refuse pile and placed at random intervals across the pile. The <br /> coal refuse is spread out in a fan shape one to two feet thick and the sediment from <br /> the ponds is spread out in layers of six inches or less across the top of the pile, so <br /> that it will not be concentrated in any one area. <br /> 41 <br />
The URL can be used to link to this page
Your browser does not support the video tag.