Chapter II <br /> For this permit submittal, and in future communications, the operator will refer to the <br /> four phases, as follows: <br /> Phase /was approved as a Permint Revision in September, 1984. <br /> Phase 11 was approved as a Technical Revision in July, 1986. <br /> Phase ///was approved as Phase /of a Technical Revision in <br /> September, 1987. <br /> Phase N(Phase 11 of the 1987 TR) has not been permitted. <br /> The Sutey facility expansion is as follows: <br /> — Phase I: The planned capacity of the pile in Phase I <br /> was approximately 875,000 cu. yds. of refuse. The <br /> total disturbed area of this phase is 15.8 acres. The <br /> pile has nearly reached the Phase I capacity at the <br /> time of permit submittal. <br /> Two sediment ponds were designed and <br /> constructed to handle Phases I and II. <br /> — Phase II: Expands the pile to handle a total of <br /> 1,700,000 cu. yds. The additional disturbed area is <br /> 14 acres. <br /> — Phase III: Expands the Sutey refuse disposal area <br /> an additional 11.1 acres, increasing pile capacity to <br /> approximately 7,800,000 cu. yds. <br /> It is anticipated this will provide sufficient capacity <br /> for 7 to 10 years of waste. <br /> The refuse conveyor will be extended an additional <br /> 1,150' north of the existing, Phase I pile, with an <br /> additional 5.3 acres of disturbed area. <br /> A third sediment pond will be constructed for Phase <br /> III. <br /> — Phase IV: The next phase, which has not yet been <br /> permitted, will provide substantial additional <br /> capacity, sufficient for many years to come. <br /> An additional sediment pond will be constructed for <br /> Phase IV. <br /> 39 <br />