Laserfiche WebLink
(4) Adit/Rock Tunnel 26 <br /> (5) Coal Refuse Facility 27 <br /> b. Pond and Impoundments 27 <br /> c. Diversions 31 <br /> d. Culverts 32 <br /> e. Maintenance 32 <br /> 5. Topsoil 33 <br /> a. Existing Topsoil Stockpiles 33 <br /> b. Topsoil Storage - 1988-1993 34 <br /> c. Topsoil - Sutey 35 <br /> d. Topsoil - Adit/Rock Tunnel 35 <br /> e. Old Refuse Pile - Topsoil 36 <br /> 6. Overburden 36 <br /> 7. Coal Handling Structures 36 <br /> a. Adit/Rock Tunnel to Load-Out 36 <br /> b. Mine Entries #3,#4,#5 37 <br /> 8. Coal Processing Waste/Non-Coal Processing Waste 38 <br /> a. Sutey 38 <br /> (1) Sutey - Phases I-IV 38 <br /> (2) Sutey - Construction, Planning 40 <br /> (3) Sutey - Operation and Maintenance 41 <br /> (4) Sutey - Reclamation 42 <br /> b. Old Pile 42 <br /> c. Non-Coal Refuse Disposal 44 <br /> (1) Solid Non-Coal Waste Disposal 44 <br /> (2) Liquid Waste Disposal 44 <br /> 9. Underground Development Waste 44 <br /> a. Rock Spoil Disposal Area 44 <br /> b. Adit/Rock Tunnel Pad Expansion 47 <br /> c. Trash Pile 47 <br /> 10. Return of Coal Processing Waste to Abandoned Workings 48 <br /> List of Appendices <br /> Number Subject Location <br /> 11-B-1 Factors Determining Production Rate Separate Tab in <br /> Vol. 2 <br /> II-B-2 Operations History " <br /> II-B-3 Adit/Rock Tunnel Project " <br /> II-B-4 List of Revisions to Permit " <br /> II-B-5 Sutey Coal Refuse Disposal Facility " <br /> II-B-6 Surface Buildings and Structures " <br /> II-B-7 Hydrologic Control Plan Vol. 3 <br /> lii <br />