Laserfiche WebLink
Chapter I <br /> k. NOV C-90-029. July 26, 1990. MLRD cited " Failure to <br /> maintain a haul road to prevent erosion. " Mid- <br /> Continent repaired the eroded area. Civil penalty paid: <br /> $1,050. <br /> 1. NOV C-90-049. October 23, 1990. MLRD cited "Failure to <br /> construct sediment ponds in accordance with approved <br /> designs. " Abatement pending. <br /> M. NOV C-90-050. October 23, 1990. MLRD cited "Failure to <br /> maintain light use roads and discharge structures <br /> associated with those roads in order to minimize <br /> erosion and disturbance to hydrologic balance. " <br /> Abatement pending. <br /> n. NOV C-90-051. October 23, 1990. MLRD cited "Failure <br /> to maintain diversions so as to minimize disturbance to <br /> the hydrologic balance." Abatement pending. <br /> o. NOV C-90-052. October 23, 1990. MLRD cited "Failure to <br /> pass all surface drainage from disturbed areas through <br /> sedimentation ponds or treatment facilities before <br /> leaving the permit area. " Abatement pending. <br /> 7 <br />