My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1987-12-01_PERMIT FILE - C1981017 (96)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981017
>
1987-12-01_PERMIT FILE - C1981017 (96)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2021 9:05:36 AM
Creation date
5/15/2012 8:35:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981017
IBM Index Class Name
PERMIT FILE
Doc Date
12/1/1987
Doc Name
Table of Contents
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
prior to completion of the Adit/Rock Tunnel extensions, coal will be transported to the <br /> surface through the Main Entry, by conveyor belt, and loaded at the portal area for <br /> transport by hill trucks down the haul road system to raw coal storage. <br /> Surface Activity <br /> Surface activities include transport of the coal to raw coal storage, storage, transport to <br /> the wash plant for processing, processing, clean coal storage, blending and loading of <br /> the coal for transport; transport of the coal to the load-out facility, loading of the coal for <br /> transport to-the customer; and, at the processing stage, transport and disposal of coal <br /> refuse, disposal of non-coal waste, maintenance of surface facilities, and <br /> environmental programs to minimize the effect of operations on the affected land, air <br /> and water resources of the area. <br /> In addition, surface activity includes the movement of men and materiel as necessary <br /> for mining, transport of the coal, disposal of refuse, etc. <br /> Background/Development <br /> The underground workings have been developed as a series of five main entries <br /> following the two coal seams down-dip from outcrop, with portal areas constructed at <br /> outcrop points. The Entries have historically been referred to as separate Mines. They <br /> are: <br /> The Dutch Creek No. 1 Mine, opened in 1956. <br /> The L. S. Wood No. 2 Mine, opened in 1973. <br /> The L. S. Wood No. 3 Mine, opened in 1966. <br /> The Bear Creek No. 4 Mine, opened in 1969. <br /> The Coal Basin No. 5 Mine, opened in 1973. <br /> Entries # 1, # 3, # 4 and # 5 were driven to produce coal from the lower B-bed seam; <br /> Entry # 2 was driven to produce coal from the upper, M-bed seam. <br /> Construction of the facilities began in 1953. Most of the major mine facilities, such as <br /> mine portals, haul roads, utility corridors and coal preparation plant facilities were <br /> constructed and had been in use many years before passage of the Surface Mining <br /> Reclamation and Control Act of 1977. <br /> 14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.