Laserfiche WebLink
U.S. DEPT. OF THE INTERIOR <br />OFFICE OF SURFACE MINING <br />Mine Site Evaluation <br />State Program <br />RECEIVED <br />Division or r ecI <br />Mining and S <br />1. Permittee /Person <br />(TRAPPER MINING, INC. <br />2. Address <br />IPO BOX 187 <br />3. City <br />(CRAIG <br />5. Zip Code <br />181626 <br />8. Mine Name <br />7. Operator Name, if Different than Permittee <br />6. Phone Number <br />1(970) 826-6100 <br />4. State <br />1 Co 1 <br />1TRAPPER MINE <br />9. Permit Number <br />IC- 010 -81 <br />11. Field Visit Date 12. Purpose <br />14/25/2012 <br />mm - 7m <br />14. Permit Status 15. Site Status <br />IA <br />lop <br />I 1 <br />17. OSM Office # 18. CCID # <br />1140 <br />105 -02838 <br />1090118 <br />1 co 1 <br />23. AVS Permittee Entity ID Number <br />10. Permit Type <br />IPP I <br />20. M.S.H.A. ID # 21. State Abbrev. 22. Coun <br />13. SRA Present <br />Y <br />16. Facilit T pe <br />19. Land Code <br />1SF 1 <br />/Burrough <br />24. State Office <br />25. Hours <br />1 4.0 1 <br />1 6.8 1 <br />1 8.0 1 <br />1 3.0 1 <br />a. Permit Review <br />b. Site Visit Time <br />c. Travel Time <br />d. Report Writing <br />Permit Type - Item 10 IP = Interim Program PP = Permanent Program NP = No Permit <br />Purpose Type Codes - Item 12 <br />Oxx...Oversight <br />Axx...Assistance <br />Date: <br />Joint Inspection - Item 13 A joint inspection is when a state Inspector accompanies an OSM inspector at any time dunng the review of the mine site <br />Permit Status - Item 14 <br />A Active Coal mining activities occurring or permitted but not yet <br />disturbed. <br />IN Inactive (Permanent Program Permit) Phase 11 completed or <br />Temporary Cessation of Operations. (Interim Program Permit). <br />Coal mining completed and reclamation activities initiated. <br />BR Bond Release Reclamation completed and State Regulatory <br />Authority(RA) has released all of the bond (Phase III Release). <br />Site Status - Item 15 <br />ND No Disturbance No coal mining and reclamation <br />operations have been started <br />EX Coal Exploration Coal exploration operations have <br />started and where coal mining operations have not <br />begun <br />AP Active Coal Producing Coal surface mining <br />activities are occumng <br />AN Active Non - Producing: Active non - producing facility <br />such as tipple or preparation plant <br />NM No Mining: The Permit Status is active, site is not in <br />Temporary Cessation, no surface coal mining <br />activity, and site not regraded <br />26. Signature Block <br />Signature <br />Christine Belka, ID #182 <br />MC <br />TC <br />P1 <br />P2 <br />P3 <br />Punted Name. <br />RFx Reclamation Fees <br />Fxx...Federal Actions <br />15/1/2012 <br />Mining Complete: No mining activity on site, site <br />regraded and awaiting bond release <br />Temporary Cessation. The RA has granted <br />cessation of mining pursuant to 30 CFR <br />816/817.13(b). <br />Phase I Release: At least Phase I bond release <br />granted for entire permitted area. For interim <br />permits, partial bond release. <br />Phase II Release: At least Phase II bond release <br />for the entire permitted area. <br />Phase III Release Reclamation completed and <br />the RA has released all bond <br />Review Date: <br />mm - dd - yyyy <br />Is Supplemental MSE Page Used Y/N <br />CCR..Citizen Complaint Referral (non -site visit <br />CC .Citizen Complaint (initial site visit) <br />CCF . Assistance <br />AB Abandoned All surface and underground coal mining activities have ceased and operator <br />has left the site without completing reclamation as defined in 30 CFR 840 11(g) <br />AB1 Bond Forfeiture: Bond forfeiture officially in process or completed and reclamation in <br />progress or not yet commenced. <br />AB2 Partially Reclaimed Forfeiture Forfeited site where all bonds have been used to reclaim site, <br />but site not reclaimed to Program standards. <br />AB3 Reclaimed Forfeiture: Forfeited site that has been reclaimed to Program standards <br />NA Not Applicable. When site is unpermitted <br />NS Non -Site Visit: Status of site not determined <br />Forfeiture Pending: The RA is pursuing actions to <br />FP revoke the permit, collect the performance bond(s), <br />and /or reclamation of forfeited site is in progress. <br />FR Forfeited and Reclaimed Forfeiture reclamation <br />completed. <br />FO Abandoned Site Abandoned site that is permitted but <br />there is no bond. <br />WC Wildcat: Coal mining and reclamation operations have <br />or are taking place and the activity is not covered by <br />the required permits from the RA. <br />Facility Type Codes - Item 16 D.. Ancillary (Haulroad, Conveyor, and /or Rails H. .Exploration Permits <br />A...Surface E....Refuse and /or Impoundment I .Notice of Intent to Explore L .. Remining site permitted under 30 CFR 785 25 <br />B .Underground F .Loading Facility and /or Tipple J ..,Exempt 16 and 2/3 <br />C .. Preparation Plant G .Stockpiles <br />K Govemment Financed Construction Exemption <br />Small Business Regulatory Enforcement Fairness Act (SBREFA) <br />Your Comments are Important <br />The Small Business and Agnculture Regulatory Enforcement Ombudsman and 10 Regional Fairness Boards were established to receive comments from small businesses about Federal agency <br />enforcement actions The Ombudsman will annually evaluate the enforcement activites and rate each agency's responsiveness to small business If you are a small business (a business with 500 or <br />fewer employees including those of affiliates) and wish to comment on the enforcement or compliance activities of OSM, call 1- 888 -REG -FAIR (1-888- 734 -3247) <br />Page 1 <br />441 <br />