Laserfiche WebLink
<br />TO: ROB ZUBER <br />FROM: JANET BINNS <br />SUBJECT: COLOWYO RN6 PRELIMINARY ADEQUACY CONCERNS <br />DATE: 5/14/2012 <br />CC: DAN HERNANDEZ <br />I have reviewed the Colowyo Permit (as scanned into Laserfiche) for compliance with the <br />following regulations: 2.04.9, 2.04.10, 2.05.4, 2.05.5, 3.02.2, 4.06, 4.15, and 4.16. Please find <br />my following adequacy concerns: <br />I have worded my adequacy concern directed towards the operator: <br />TOPSOIL REMOVAL PLAN: PERMIT SECTION 2.05 PG. 2.05-13, RULE 2.05.3, MAPS 28 <br />& 28A LOM TOPSOPIL BALANCE TABLE 2.05-1 12/2005 <br /> <br />1.Map 28 Topsoil Handling South Area was updated during MR107, dated April 13, 2011. <br />Please confirm that this map reflects the topsoil handling plans for the next permit term <br />and update this map as necessary. <br />Map 28B Topsoil Handling South Taylor Area was updated 11/26/2011 during MR114. <br />Please confirm that this map reflects the topsoil handling plans for the next permit term <br />and update this map as necessary. <br />(Map 28 A is the North Area be fine, since little if any reclamation or new disturbance is <br />occurring in the North Area.) <br /> <br />2.The Division was unable to locate Table 2.05-1. Either in the scanned permit, the <br />Tables_ALL_C_1981_ <br />019.pdf <br />approved permit pages, or in the “ file sent to RDZ by CCC. CCC <br />: <br />needs to submit a topsoil mass balance for the mine that reflects current 2012 conditions <br />for all areas of the mine. Please provide Table 2.05-1 Topsoil Balance, to reflect 2012 <br />conditions. <br /> <br /> <br />3.South Taylor Pit Topsoil mass balance Table 2.04.9-7 was last updated January 2008. <br />Please review this table and update the Topsoil mass balance values to reflect the current, <br />2012, conditions and projected permit term values. <br /> <br /> <br />2.05.4RECLAMATION PLAN: <br /> <br />