My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-14_REVISION - C1981010 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981010
>
2012-05-14_REVISION - C1981010 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:41 PM
Creation date
5/14/2012 12:50:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
Revision
Doc Date
5/14/2012
Doc Name
Final Letter & Attached BLM & OSM Concurrence Letters
From
DRMS
To
Trapper Mining, Inc
Type & Sequence
SL13
Email Name
JLE
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
United States Department of the Interior`�T <br />(� OFFICE OF SURFACE MINING <br />Reclamation and Enforcement <br />��q �e,, •' Western Region Office <br />RCH_3y 1999 Broadway, Suite 3320 <br />Denver, CO 80202 -3050 <br />May 3, 2012 <br />David Berry <br />Division of Reclamation, Mining, and Safety <br />1313 Sherman Street, Room 215 MAY 0 7 ?ill? <br />Denver, CO 80203 -2273 �.jV1Sion of Reclamation, <br />Mining and Safety <br />RE: Trapper Mining, Inc. (DRMS Permit No. C- 1981 -010) <br />OSM Concurrence for Phase III Partial Bond Release (SL -13) <br />Dear Mr. Berry, <br />This letter acknowledges the Office of Surface Mining (OSM), Denver Field Division's (DFD) <br />receipt and review of the above Phase III Partial Bond Release Proposed Decision document <br />prepared by the Division of Reclamation, Mining, and Safety dated March 27, 2012. The <br />inspection for this bond release was conducted on August 31, 2011. The DFD agrees with the <br />findings and decision document and hereby provides OSM concurrence for the above bond <br />release action in accordance with 30 CFR 740.15 (d) (3), and 30 CFR 906.30, Article IX, Section <br />24, of the State - Federal Cooperative Agreement. <br />DRMS's Proposed Decision documents the applicant's compliance with the Colorado approved <br />regulatory program at Rule 3.03 of the Regulations of the Colorado Mined Land Reclamation <br />Board for Coal Mining, and DRMS's bond release guidelines dated April, 18, 1995. <br />By letter dated August 25, 2011, Trapper Mining Inc. (TMI), permittee for the Trapper Mine, <br />applied for Phase III bond release for approximately 365 acres of lands in the Ashmore (A), <br />Derringer (D), and Flintlock (F) Pits. The lands included in this SL -13 bond release request <br />received Phase I and II bond release with DRMS approval of SL -5 and SL -6. These areas were <br />sampled during 2010 and 2011 by Kent Crofts of IME to determine vegetation establishment <br />success for Phase III bond release. <br />This Phase III bond release applies to 323.5 acres for parcels A -B -00, A -B -01, A -B -99, D -AB- <br />00, D- AB -99, D -C -99, F- AB -00, and F- AB -99. This acreage differs from the original amount <br />requested for bond release as a result of an adequacy review letter that was sent to TMI on <br />January 18, 2012. In that letter, DRMS cited that a portion of F -AB -01 (included in the phase III <br />bond release request) was seeded in the spring of 2002 and therefore not eligible to receive phase <br />III bond release. TMI also requested that a parcel of land for a corridor to the Oak Gulch <br />
The URL can be used to link to this page
Your browser does not support the video tag.