My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-10_REVISION - M1987013 (3)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1987013
>
2012-05-10_REVISION - M1987013 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:29 PM
Creation date
5/10/2012 3:35:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1987013
IBM Index Class Name
REVISION
Doc Date
5/10/2012
Doc Name
RESPONSE
From
OSE
To
DRMS
Type & Sequence
CN1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director /State Engineer <br />Response to Reclamation Permit Conversion Application Consideration <br />DATE: May 9, 2012 <br />TO: Bob Oswald, Environmental Protection Specialist RECEIVED <br />CC: Division 3 Office; District 20 Water Commissioner -InAi 1 0 2012 <br />FROM: Caleb Foy, E.I.T. CRF / Lw Division of Reclamation, <br />✓ TU Mining & Safety <br />RE: Burton Pit, File No. M- 1987 -013 <br />Operator: Southway Construction Company, Inc. <br />Contact: Ralph Martinez, (719) 589 -5105 <br />Sec. 19, Twp. 40N, Rng. 6E, N.M.P.M., Rio Grande County <br />CONDITIONS FOR APPROVAL <br />® The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on -site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />® Other: The water hauled from offsite for dust control shall be a legal supply of water provided by <br />an appropriate supplier. <br />COMMENTS: The local Water Commissioners, Steve Baer and Joe McCann, may be contacted regarding <br />legal supplies of water in the area. Steve Baer may be contacted at (719) 588 -3704 or <br />Steve. Baerp_state.co.us and Joe McCann may be contacted at (719) 852 -4351 or.loe.Mccann@state.co.us. <br />state.co.us. <br />k' A Qs Z"" <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 - 866 -3581 i, Fax: 303 - 866 -3589 <br />http://water.state.co.us <br />
The URL can be used to link to this page
Your browser does not support the video tag.