My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-10_REVISION - M1977342
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977342
>
2012-05-10_REVISION - M1977342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 6:19:05 PM
Creation date
5/10/2012 3:26:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977342
IBM Index Class Name
REVISION
Doc Date
5/10/2012
Doc Name
Submittal of As-Built Drawings for Original Construction of Ultimate Canal
From
CLIMAX
To
DRMS
Type & Sequence
TR4
Email Name
PSH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
k <br />® <br />Climax Molybdenum <br />A Freeport- McMoRan Company <br />May 9, 2012 <br />Via UPS Tracking Number: 1Z 804 847 13 7255 5613 <br />4r. Peter Hays <br />Division of Reclamation Mining and Safety <br />1313 Sherman St., Rm. 215 <br />Denver, CO 80203 <br />COLORADO OPERATIONS <br />Henderson Mill <br />P.O. Box 68 <br />Empire, CO 80438 <br />Phone (303) 569 -3221 <br />Fax (303) 569 -2830 <br />RECEIVeo <br />'MAY 10 2 012 <br />4 Division of Reclamation, <br />!Mining & Safety <br />Re: Permit M- 1977 -342, TR -04, Submittal of As -Built Dfawings for Original Construction of. <br />Ultimate Canal <br />Dear Mr. Hays: <br />On March 20, 2012 Climax Molybdenum Company (CMC) submitted Construction Certification and the <br />final As -Built Drawing for the Henderson Mill "ultimate" clean water interceptor canal (Ultimate Canal), and <br />this was approved by the Division of Reclamation, Mining and Safety (DRMS) on April 20, 2012. The <br />submitted construction certification and as -built drawing included the complete canal alignment and noted <br />minor modifications made to original design, but did not include the full set of as -built drawings from the <br />original construction in 2007. As requested during your April 20 site visit, we are submitting this full set of <br />as -built drawings from original construction in 2007. <br />Please contact me at (303) 569 -3221, ext. 1233 or Bryce Romig (ext. 1204) if you have any questions. <br />Sincerely, <br />Miguel Hamarat <br />Chief Environmental Engineer <br />Climax Molybdenum Company <br />Henderson Operations <br />Attachments: <br />1. Ultimate Canal Original Construction As -Built Drawings <br />cc (via email): <br />B. Romig, Climax <br />T. Haynes, Climax <br />
The URL can be used to link to this page
Your browser does not support the video tag.