Laserfiche WebLink
Description of Bond Release Amount: $481,614 <br />The bond release amount is a proportional amount based on the area of roads for which <br />release is requested versus the total area of BB and 2700 Road that is currently bonded <br />for. The values in the bond shown below are from Attachment 3.02.2 -2 of the currently <br />approved permit. <br />County Road Construction Bond Amount <br />27 RD Asphalt Cost $ 115,360 <br />27 RD Class 6 Gravel $ 44,337 <br />27 RD Class 2 Gravel $ 88,124 <br />BB RD East Asphalt $ 108,830 <br />BB RD East Class 6 Gravel $ 41,829 <br />BB RD East Class 2 Gravel $ 83,134 <br />Total $ 481,614 <br />4 <br />