My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-05-08_REVISION - M1977493
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977493
>
2012-05-08_REVISION - M1977493
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:57:28 PM
Creation date
5/8/2012 1:10:51 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977493
IBM Index Class Name
REVISION
Doc Date
5/8/2012
Doc Name
Technical Revision 18 - Water Quality Monitoring Plan
From
CLIMAX
To
DRMS
Type & Sequence
TR18
Email Name
ECS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
iOmw Climax Molybdenum <br />0e <br />A Freeport- McMoRan Company <br />Sent by Certified Mail <br />May 4, 2012 <br />Mr. Eric Scott <br />Environmental Protection Specialist <br />Division of Reclamation, Mining and Safety <br />Department of Natural Resources <br />1313 Sherman St. Room 215 <br />Denver, Colorado 80203 <br />Climax Mine <br />Highway 91 - Fremont Pass <br />Climax, CO 80429 <br />Phone (719) 486 -7718 <br />Fax (719) 486 -2251 <br />RE: Conceptual Hydrogeological Model and Proposed New Groundwater Monitoring Well <br />Locations, Climax Mine, Permit No. M- 1977 -493, Technical Revision 18 - Water <br />Quality Monitoring Plan <br />Dear Mr. Scott, <br />Attached please find the April 27, 2012 letter -report from ARCADIS to Climax Molybdenum <br />Company, Climax Mine that describes the conceptual hydrogeological model for the site and <br />recommended new groundwater monitoring well locations. The report was prepared in accordance <br />with the Climax Water Quality Monitoring Plan, included in the Environmental Protection Plan <br />(Technical Revision 18), that stated Climax would conduct a hydrological characterization prior to <br />the 2012 field season to better assess the locations of new monitoring and point of compliance wells. <br />Climax is prepared to begin scheduling the well construction for the upcoming field season upon <br />your approval of the recommended well locations. Please contact me at 719- 486 -7584 if you would <br />like to discuss the findings in the report. <br />Sincerely, <br />Raymond Lazuk <br />Environmental Manager <br />attachment RECEIVED <br />MAY 0 6 2012 <br />Division of Reclamation, <br />Mining S Safety <br />
The URL can be used to link to this page
Your browser does not support the video tag.