Laserfiche WebLink
Force Main System <br />Item <br />Quantity <br />Unit <br />Unit Price <br />Extension <br />Mobilization <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />Dewatering <br />1 <br />LS <br />$ 15,000.00 <br />$ 15,000.00 <br />Clearing and Grubbing <br />1 <br />AC <br />$ 2,000.00 <br />$ 2,000.00 <br />Channel Excavation <br />1 <br />LS <br />$ 10,000.00 <br />$ 10,000.00 <br />Agridrain (6'x12 ") <br />1 <br />LS <br />$ 1,500.00 <br />$ 1,500.00 <br />12' Manhole/Vault <br />1 <br />EA <br />$ 8,000.00 <br />$ 8,000.00 <br />12" HDPE <br />10 <br />LF <br />$ 60.00 <br />$ 600.00 <br />10" C900 <br />700 <br />LF <br />$ 60.00 <br />$ 42,000.00 <br />Lift Station (1000 gpm) <br />1 <br />LS <br />$ 25,000.00 <br />$ 25,000.00 <br />Electric Service <br />1 <br />LS <br />$ 5,000.00 <br />$ 5,000.00 <br />Site Reclamation <br />1 <br />AC <br />$ 2,000.00 <br />$ 2,000.00 <br />Subtotal <br />Contigency (20%) <br />TOTAL <br />$ 116,100.00 <br />$ 23,220.00 <br />$139,320.00 <br />Hazeltine Mine - Dewatering System Preliminary Cost Estimate <br />